Similar Projects
Last Updated | 09/22/2022 08:44 AM |
Project Title | Laurel Street Water Main Installation Project |
Physical Address | View project details and contacts |
City, State (County) | Napa, CA 94559 (Napa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,078,078 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work generally consists of furnishing labor, equipment, materials and required services associated with the installation of approximately 550 feet of 12-inch fused C-900 PVC DR 14 water main on Laurel Street from Riordan Lane to Griggs Lane. The installation of approximately 300 feet of fused 8-inch C-900 PVC DR 14 water main to replace an existing 4" and 6" cast iron water main with the reconnection of 5 services. The installation of a 36-inch bypass valve assembly on the existing 36" asbestos cement transmission main and the installation of 200 feet of 36-inch AWWA C200 steel cement lined and coated (CMLC) transmission main. There are six tie-in locations connecting new main to existing mains at various locations. Important Bid Bond required |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |