Similar Projects
Roof Replacement of the Corwin House
Term Contract
Design
$100,000 to $250,000 est. value
Riverhead, NY 11901

2021-2022 and 2022-2023 Capital Improvement Program
Renovation
Sub-Bidding
$800,000 CJ est. value
Northport, NY 11768

Partial Roof Replacements at Jack Abrams Stem Magnet School and Huntington High School
Renovation
Sub-Bidding
$1,600,000 CJ est. value
Huntington, NY 11743

William Floyd D2 HS Field House Press Box
Alteration
Post-Bid
$70,000 to $110,000 est. value
Mastic Beach, NY 11951

Roof Repairs
Alteration
Post-Bid
NY

Roof Improvements - Cohalan Family Court
Alteration
Results
Central Islip, NY 11722

Springs Library Roof Replacement
Alteration
Results
East Hampton, NY 11937

Roof and Gutter Repairs
Alteration
Post-Bid
Southampton, NY

Main Terminal Atrium Roof Coping Replacement
Alteration
Results
Islip, Ronkonkoma, NY 11779

Chavez and Tubman Leak Mitigation-Roofing Repairs
Alteration
Post-Bid
Stony Brook, NY 11794

Job Order Contracting - Area 1 and 2
Alteration
Results
$2,000,000 to $3,000,000 est. value

Fluid Applied Roof Project
Alteration
Post-Bid
$400,000 est. value
Southampton, NY 11968

Roofing and Carpentry at Various Water Authority Sites
Term Contract
Results
Bayport, Brentwood, Peconic, Southampton, Westhampton Beach, Yaphank, NY 11717

Tuckahoe School, Asphalt Shingle Roof Replacement
Alteration
Post-Bid
$400,000 est. value
Southampton, NY 11968

Phase 2 Roof Replacements at Connetquot Public Library
Renovation, Alteration - 9,000 SF
Results
$195,000 est. value
Bohemia, NY 11716

Last Updated 03/20/2023 06:35 PM
Project Title

The Eastport South Manor Junior senior High School

Physical Address View project details and contacts
City, State (County) Manorville, NY 11949   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,875,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A. The purpose of the project is varies building upgrades and site work,. B. This Section provides an abbreviated summary of the work for the Construction Contract associated with the Owner's program to construct the project. C. Each Contractor has been provided with copies of all relevant construction drawings for related construction contracts whose work may directly effect and impact the work under this Contract. 1. Each Contractor shall provide a complete and operational project in anticipation of these affects and impacts. 2. It is each Contractor's responsibility to investigate the work that will be performed by others and consider such in the conduct of his/her work. D. In the event that any of the provisions in the technical specifications conflicts with the general conditions, the provision more favorable to the owner, as determined by the owner in its sole discretion, shall govern. Bid result TOTAL BASE BID (A) (INCLUDING ITEMS 1-6) RC-1 - Niko K Construction Corp - $1,523,000 TOTAL BASE BID (B) (INCLUDING ITEMS 1-6) RC-1 - Niko K Construction Corp - $1,352,000

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents