Similar Projects
Last Updated | 01/13/2020 09:53 AM |
Project Title | 25 Bunker Road Drainage Infiltrator Replacement |
Physical Address | View project details and contacts |
City, State (County) | Nantucket, MA 02554 (Nantucket County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $18,328 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of removal of an existing infiltrator system, and replacement with same or better system. Consists of removal of an existing infiltrator system, and replacement with same or better system. Contractor is to install 4 rows at 50' each of StormTech SC-740 chambers (or approved equal) with 6” of stone under, and filled to 6” above chambers covered with filter fabric, and re-piped to original piping from catch basin. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |