Similar Projects
Traffic Signal Modifications at the Intersections of Edgewood Road and Kingston Road, Edgewood Road and Eastern Boulevard and Haines Road and Eastern Boulevard
Bidding
Pleasureville, York, PA 17402

Traffic Signal and Street Lighting Maintenance and Repair Services
Infrastructure, Alteration
Bidding
York, PA

Traffic Signal Replacement Project
Post-Bid
State College, PA 16801

Traffic Improvements of Ewing Road at Cherrington Parkway at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15231

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

Green Light Go Traffic Signal Upgrade Project
Results
$350,000 est. value
Elysburg, PA 17824

Traffic Signal Maintenance
Term Contract
Bidding
Exton, PA

Traffic Signal Maintenance
Post-Bid
North Huntingdon, PA

Flashing Warning Device along Valley Vista Road
Results
$25,000 est. value
State College, PA 16801

City Avenue Signal System UPS Battery Backup Upgrades
Infrastructure
Bidding
PA

Traffic Control and Public Safety Services 2020
Post-Bid
Williamsport, PA 17701

Traffic Monitoring Sites Install and Repair
Results
$100,000 to $199,999 est. value
PA

Signal Modernization at Dresher Road and Walnut Grove Drive
Infrastructure
Bidding
Horsham, PA 19044

Maintenance of Traffic Signalization
Term Contract
Post-Bid
Scranton, PA 18503

Main and Zerby Traffic Signal Project
Results
Edwardsville, PA 18704

Last Updated 11/11/2021 04:04 PM
Project Title

Mulder Square Transportation Improvements

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17101   (Dauphin County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following: 1. Construction of a mini-roundabout with drainage and traffic calming improvements at the intersection of Mulberry and Derry Streets. 2. Installation of new street lighting and ADA ramps on Mulberry Street from the Mulberry Street bridge to Derry Street. 3. Reconstruction of Nectarine Street from Mulberry Street to Haehnlen Street including drainage and lighting improvements. 4. Removal of the Derry Street cul-de-sac. 5. Construction of a Multiuse Trail from Sylvan Terrace to Cameron Street with drainage and lighting improvements.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents