Similar Projects
A-Affordable Storage / Bullard
New Construction, Infrastructure - 200,000 SF
Design
$3,000,000 CJ est. value
Bullard, TX 75757

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

Tyler Junior College - Garden and Landscape Project
Infrastructure
Bidding
$100,000 CJ est. value
Tyler, TX 75701

Financial Crimes Intelligence Center (FCIC) Office Remodel
Addition, Demolition, Build-out, Renovation, Infrastructure
Bidding
$280,000 CJ est. value
Tyler, TX 75702

Kinzie Community Center Renovations and Addition
Renovation, Addition - 5,570 SF
Post-Bid
$700,000 to $800,000 est. value
Lindale, TX 75771

New Sanctuary - Mt. Sylvan Baptist Church
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Tyler, TX 75702

FM 16 - Widen Road - Add Lanes
Infrastructure
Results
$44,362,527 CJ est. value
Lindale, TX 75771

Bicycle and Pedestrian Improvements
Infrastructure
Results
$548,791 CJ est. value
Tyler, TX 75701

Dutch Bros Coffee (Shell Shack) / Dutch Bros / Tyler
New Construction, Infrastructure - 950 SF
Construction
$350,000 CJ est. value
Tyler, TX 75703

Amazon River's Edge / Caldwell Zoo
New Construction, Infrastructure - 130,000 SF
Pending Verification
$10,000,000 CJ est. value
Tyler, TX 75702

Fresh #801 / Tyler
Infrastructure, Build-out - 55,774 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75703

Cascade Park Village Apartments
New Construction, Infrastructure - 811,384 SF
Bidding
$30,000,000 CJ est. value
Tyler, TX 75701

Dutch Bros Modular - Sitework Only
New Construction, Infrastructure
Post-Bid
Tyler, TX 75703

SH 64 - Intersection Improvements With Right and/or Left
Infrastructure
Results
$2,208,247 CJ est. value
Tyler, TX 75704

Superior Storage / Tyler
New Construction, Infrastructure - 135,918 SF
Design
$9,000,000 CJ est. value
Tyler, TX 75702

Last Updated 08/08/2022 05:08 PM
Project Title

Douglas R Mehling Activities Center-Breckenridge Village

Physical Address View project details and contacts
City, State (County) Tyler, TX 75704   (Smith County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New multipurpose building, exterior and interior construction and site development. An architect has been selected. As of August 5, 2022, design is complete. Information regarding the selection of a general contractor has not been disclosed. Construction is anticipated to begin in August 2022 and be completed in August 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

28,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents