Similar Projects
Windsor Pond Phase IV
Post-Bid
$592,665 est. value
Saint Peter, MN

Windsor Pond Phase IV
Post-Bid
$592,665 est. value
Saint Peter, MN

2021 Street and Miscellaneous Paving Improvements
Results
North Mankato, MN

2021 Street and Miscellaneous Paving Improvements
Results
North Mankato, MN

2021 Street Seal Coating
Post-Bid
Saint Peter, MN

North 3rd Street (West Street Julien Street to 1000-FT North), Center Street, and Mcleod Street Improvement
Results
Saint Peter, MN 56082

North Smoky Hills Graveling
Renovation
Post-Bid

New Ulm Spring Roadside Parking Area
Results
MN

Sewer Vacuum, Hydro-Excavation, and Municipal Pumping Equipment
Alteration
Post-Bid

2021 Street and Utility Improvements
Results
North Mankato, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 North 3rd Street Improvements (Livermore Street - Union Street)
Results
$192,200 est. value
Saint Peter, MN 56082

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Post-Bid
Brainerd, MN

Belgrade Avenue Street Lighting and Sidewalk Improvements
Results
North Mankato, MN 56003

CSAH 13 Concrete Overlay
Results
Saint Peter, MN

Last Updated 05/05/2022 05:52 AM
Project Title

2022 Lor Ray Drive Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) North Mankato, MN 56003   (Nicollet County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Miscellaneous removals Detour route, temporary access road and traffic control Clearing & grubbing trees 17,500 sq. yd. bituminous pavement (common excavation, geogrid, 14” aggregate base, 4” PVC perforated underdrains, B618 curb & gutter, 4.0” bituminous base course, 1.5” bituminous wearing course) 3,400 sq. yd. bituminous trail (common excavation, geogrid, 10” aggregate base, 3.0” bituminous wearing course) 3,600 sq. yd. concrete driveway aprons & concrete sidewalks 3,600 lin. ft. 12”to 24” diameter storm sewer, with catch basins, manholes and casting assemblies 2 each stormwater filtration ponds (excavation, 4” PVC perforated underdrains, outlet structures) 3,800 lin. ft. 8” to 12” diameter sanitary sewer with manholes and services 900 lin. ft. 6” diameter watermain, with valves, hydrants, and services Turf establishment and temporary erosion control Street lighting system

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents