Similar Projects
Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Kevin & J Company Warehouse
New Construction, Infrastructure - 26,832 SF
Conception
$5,000,000 CJ est. value
Lawrenceville, GA 30043

SR 26 From I-516 to CS 188 / Ogeechee Road
Infrastructure
Design
$20,000,000 CJ est. value
Bloomingdale, GA 31302

2022 Resurfacing and Restoration Project
Infrastructure
Design
$2,000,000 CJ est. value
Thomaston, GA 30286

Darien Downtown Development Authority Dock Repairs
Infrastructure
Bidding
$1,273,000 CJ est. value
Darien, GA 31305

Augusta Museum of History Addition
Addition, Demolition, Infrastructure
Bidding
$8,500,000 CJ est. value
Augusta, GA 30901

Terminal Area Expansion Grading and Drainage Phase 1A
Post-Bid
Dallas, GA 30157

Gateway Building and Infrastructure
New Construction, Infrastructure
Post-Bid
$32,500,000 CJ est. value
Lawrenceville, GA 30043

South Central Headworks WWTP Concrete Channel Rehabilitation
New Construction
Results
$299,750 est. value
Douglasville, GA

Tribble Road Pump Station, Gravity Sewer, and Force Main Project
New Construction, Infrastructure
Results
Cumming, GA 30028

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

The Gathering Alpharetta - Morrison Park
New Construction, Infrastructure - 41,900 SF
Pending Verification
$55,000,000 CJ est. value
Alpharetta, GA 30009

North Fulton Expressway Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Alpharetta, GA 30009

North Avenue NE Multi-Family Building
Demolition, New Construction, Infrastructure - 46,124 SF
Conception
$12,600,000 CJ est. value
Atlanta, GA 30308

Last Updated 09/19/2022 09:05 AM
Project Title

Groundwater Test Well

Physical Address View project details and contacts
City, State (County) Cornelia, GA 30531   (Habersham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Cornelia ("Owner") is requesting proposals to select a qualified company ("Contractor" or "Proposer") to drill a groundwater test well at the water treatment plant (WTP). No proposal may be withdrawn after the closing time for the receipt of proposals for a period of sixty (60) days except as specifically may be provided by State law. Drill and develop one (1) groundwater well at the location shown on the drawings. The well is estimated to be approximately 600 linear feet deep with a 12" bore hole and 8" steel casing extending from two (2) feet above ground surface to five (5) feet into the first solid, unweathered, or impervious subsurface rock strata encountered. Construction of the test well shall be complete including steel casing, cement grouting, 72-hour pump test, water quality sampling,site access provisions, and all other appurtenances required to complete the test well. Time allotted for completion of work is thirty (30) calendar days. All work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Work will be awarded in one (1) Contract/Purchase Order. The person constructing the test well shall be a licensed water well contractor in the State of Georgia in accordance with the provisions of the Water Well Standards Act of 1997 (O.C.G.A. 12-5-120). The Status of Federal, State and/or local permits for this project are as follows: A. Land Disturbing Permit Not Required B. NPDES GAR 100001 (Stormwater) Not Required C. GA EPD Permission to Drill Pending D. GA EPD New Well/Spring Application Pending All other questions may be directed to Amy Chinouth, achinouth@cartersloope.com, at the issuing office, Carter & Sloope, Inc., Watkinsville, GA, 706-769-4119 BONDS - NONE REQUIRED Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any PROPONENT if Owner believes that it would not be in the best interest of the Project to make an award to that PROPONENT, whether because the Proposal is not responsive or the PROPONENT is unqualified or of doubtful financial ability or failsto meet any other pertinent standard or criteria established by the Owner

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents