Similar Projects
Last Updated | 09/13/2022 02:36 PM |
Project Title | Reservoir Busway Repair |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA 02135 (Suffolk County) |
Category(s) | Transportation |
Sub-Category(s) | Misc. Structures |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $370,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Massachusetts Bay Transportation Authority (MBTA) wishes to repair the drop-off/pick-up area for buses at Reservoir Station on Chestnut Hill Avenue. The Massachusetts Bay Transportation Authority (MBTA) wishes to repair the drop-off/pick-up area for buses at Reservoir Station on Chestnut Hill Avenue. The scope of work is defined in the stamped design drawings prepared by VHB dated April 2022. 2.1.1 VHB Construction Documents in COMMBUYS 2022-04-22_15063-01_Reservoir_Rehab_Final_Design_Rev_1 2.1.2 Limitation of Operations The Contractor is required to submit a Safety/Quality/Construction Management Plan for approval prior to commencing work. The contractor always has the primary responsibility for on-site safety. Limits on the construction work are defined in the stamped design drawings prepared by VHB dated April 2022. These include, but are not limited to, maintaining access to the MBTA's outbound and inbound platforms at Reservoir Station on the Green Line during all revenue hours. Rapid setting concrete must be used in locations that are required to accept pedestrian traffic after the end of non-revenue hours. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |