Similar Projects
Davenport Park Landfill Gas Control System
Alteration
Results
$1,300,000 est. value
Long Beach, CA 90899

Contractors Panel at the Riverside Regional Water Quality Control Plant, Citywide Sewer/Storm Drain Collection System and Tequesquite Landfill
Term Contract
Post-Bid
Riverside, CA

Landfill Gas Treatment System Upgrade
Infrastructure
Results
$350,000 est. value
Upland, CA 91786

Landfill Disposal Site In Los Angeles County
Term Contract
Results
CA

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Post-Bid
CA

Last Updated 12/06/2021 06:13 AM
Project Title

Landfill Gas System Modifications

Physical Address View project details and contacts
City, State (County) Linden, Lodi, CA 95240   (San Joaquin County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $586,000 to $645,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, consists of installing landfill gas extraction wells at North County and Foothill Landfills with associated new piping. The work is located at North County Landfill (17720 E Harney Ln Lodi, Ca 95240) and Foothill Landfill (6484 N Waverly Rd Linden, Ca 95236).

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents