Similar Projects
Bldg 640 Rm 334 Furniture
Bidding
OH 45433

Systems Furniture & Installation
Bidding
Washington, DC

Miscellaneous Furniture and Furnishings
Post-Bid

Building 32 Atrium Furniture
Post-Bid
Wright Patterson Air Force Base, OH 45433

Moving and Storage Services
Results

Systems, Executive, and Lounge Furniture and Chairs
Results
Beaver Creek, OH 45324

Integrated Modular Medical Support Systems (IMMSS) Systems Furniture
Post-Bid

HPSI Seating
Results
Wright Patterson Air Force Base, OH 45433

DoDEA Life Cycle Replacement for School and Office Furniture
Post-Bid
$250,000 to $15,000,000 est. value

Bldg 65 Office Furniture
Results
Dayton, Wright Patterson Air Force Base, OH 45433

Room W115 Furniture Reconfiguration
Post-Bid
Wright Patterson Air Force Base, OH 45433

Dry Stripping Cabinet
Results
Wright Patterson Air Force Base, OH

Room W174B Furniture Reconfiguration
Post-Bid
Dayton, Wright Patterson Air Force Base, OH 45433

New Primary School - Furniture Packages
Results
Less than $323,314 est. value
Fairborn, OH 45324

Room E103 & E103B Furniture Reconfiguration
Post-Bid
Wright Patterson Air Force Base, OH 45433

Last Updated 12/22/2020 04:27 PM
Project Title

Steelcase Avenir Reconfiguration - W178

Physical Address View project details and contacts
City, State (County) Fairborn, OH 45324   (Greene County)
Category(s) Single Trades
Sub-Category(s) Furnishings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide services and product necessary to complete the reconfiguration of workstation furniture in Building 856, Room W178. Contractor shall provide all materials, services, labor, and tools required to dismantle existing furniture and rebuild to reflect the attached schematic (Attachment 1). Contractor shall reconfigure W178 to add 13 workstations. Contractor shall dismantle (9) Lshape workstations that vary in sizes (see existing plan for details), (2) meeting spaces, (2) dropin stations, and misc. files and cabinets. The contractor shall then rebuild stations using existing and new product per the attached plans. Rebuild and tear down shall take place in two phases. Phase 1 tear down and install shall occur first. Once completed, phase 2 tear down and install shall start.

Details

Division 12 - Furnishings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents