Similar Projects
5501 Charlie Meyers Stream Restoration
Infrastructure
Bidding
Lake George, CO

Jackson Gulch Outlet Rehabilitation Segment #2 Project
Alteration
Bidding
Mancos, CO 81328

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Las Vegas Street Culvert at Colony Hills Channel
Results
Less than $1,000,000 est. value
Colorado Springs, CO 80903

Jackson Gulch Outlet Rehabilitation Segment #3 Project
Alteration
Bidding
Mancos, CO

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Bidding
Denver, CO

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

Flying Horse Pond 1 Retrofit
Infrastructure
Bidding
Colorado Springs, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Derby Hill Park Drainage and Hardscape Improvements
Results
Less than $100,000 est. value
Loveland, CO

Last Updated 06/15/2021 04:30 AM
Project Title

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS

Physical Address View project details and contacts
City, State (County) CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

seeks a qualified Consultant Team to provide design engineering services for the East Shade Shelters and Tower Loop Shoreline Stabilization Project (Project) along a portion of the east shoreline of the Cherry Creek Reservoir. The Project area is located within Arapahoe County and Cherry Creek State Park, along Boat Ramp Access and Tower Loop Roads, approximately 1 and 1.6 miles respectively from the East (Parker Road) Park entrance (see Attachment 1). The Project areas include: 1. East Shade Shelters is approximately 0.3-acres including the area between the concrete access trail or top of bank and the existing riprap along the shoreline at the toe of the bank. It includes approximately 400-feet of shoreline. 2. Tower Loop is approximately 0.5-acres including the area between the dirt social trail or top of bank and the existing riprap and boulders along the shoreline at the toe of the bank or water’s edge. It includes approximately 700- feet of shoreline.

Details

Division 03 - Concrete, Concrete Accessories, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents