Similar Projects
Point Elementary School HVAC - Mehlville School District
Renovation
Conception
$250,000 CJ est. value
Saint Louis, MO 63129

Oakville Middle School HVAC - Mehlville School District
Renovation
Conception
$470,000 CJ est. value
Saint Louis, MO 63129

High School Library
Renovation - 10,000 SF
Design
$1,500,000 est. value
Clayton, MO 63105

Villa Di Maria Montessori School / Kirkwood
New Construction
Design
$3,000,000 est. value
Kirkwood, MO 63122

Phase II - Additions and Alterations to Bierbaum Elementary School
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Saint Louis, MO 63125

Grease Trap Replacement At 10 District Locations
Renovation
Bidding
$200,000 CJ est. value
Hazelwood, MO 63042

2022 Summer Work District Wide Bid Package A
Renovation
Post-Bid
Chesterfield, MO

2022 Summer Work District Wide Bid Package A
Renovation
Post-Bid
Chesterfield, MO

McGrath ES and ECC Building Package (Phase 1)
New Construction
Results
$15,000,000 to $16,000,000 est. value
Brentwood, MO 63144

Summer 2021 Building Renovations and Site Improvements
Renovation
Results
MO

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Blades Elementary School Outdoor Lighting - 2021 Bond Proposition S - Mehlville School District
Infrastructure
Construction
$75,000 CJ est. value
Saint Louis, MO 63129

Beasley Elementary School Security Entrance - 2021 Bond Proposition S - Mehlville School District
Renovation
Pending Verification
$300,000 CJ est. value
Saint Louis, MO 63125

Beasley Elementary School Additional Restrooms - 2021 Bond Proposition S - Mehlville School District
Renovation
Pending Verification
$300,000 CJ est. value
Saint Louis, MO 63125

District-Wide Building Automation System Modernization Project
Renovation
Design
$1,500,000 est. value
Byrnes Mill, MO 63025

Last Updated 02/21/2023 01:39 AM
Project Title

Mesnier Primary School and Gotsch Intermediate School - Metal Awning Installation

Physical Address View project details and contacts
City, State (County) Affton, MO 63123   (Saint Louis County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $72,760 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

REQUEST FOR PROPOSAL for Mesnier Primary School & Gotsch Intermediate School Metal Awning Installation. ADDRESS INQUIRIES TO: Jeff Rooks Director of Buildings & Grounds P: (314) 633-5925 E:Jrooks@afftonschools.net Affton Administration Building 8701 Mackenzie Road Affton, MO 63123 SCOPE OF WORK Affton School District is seeking a qualified contractor to remove existing metal awning frame, support posts below ground & patch concrete at Mesnier Primary School and install a new hanger rod supported metal awnings at both Mensier Primary School and Gotsch Intermediate School. Work by the contractor includes all labor, materials, and equipment necessary to complete all work per this bid specification and plans. It is intended that the contractor shall provide a working installation complete in every detail and all items necessary for such complete installation shall be furnished whether specifically mentioned or not. All work to be performed in a thorough and professional manner by mechanics skilled in their respective trades, using materials specified, or materials approved by the school district as equal in quality, capacity, and performance to those specified. All work will meet all requirements, codes, and regulations of the highest governing body whether it is St. Louis County, the State of Missouri, or the Federal Government, Boca, NFPA, local Fire Department, or any other governing body. Any necessary permits and fees are the responsibility of the contractor.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents