Similar Projects
9 Urgent Repair Properties
Renovation
Bidding
Rocky Mount, NC 27804

9 Urgent Repair Properties
Renovation
Bidding
Rocky Mount, NC 27804

Housing Repair Project
Renovation
Post-Bid
Rocky Mount, NC 27801

Construction of (2) Single Family Houses Whatley Cove - 909 and 913 Authority Drive
New Construction - 3,182 SF
Post-Bid
Rocky Mount, NC 27801

Structure Repair at 1024/1026 Stokes Street
Results
Less than $146,000 est. value
Rocky Mount, NC

Urgent Home and Housing Repair
Results
Rocky Mount, NC 27801

Urgent Home Repair Eight Properties
Renovation
Post-Bid
Rocky Mount, NC 27804

Housing Repair and Urgent Repair Project
Renovation
Results
Less than $11,949 est. value
Rocky Mount, NC

Housing Rehabilitation - Atlantic Arlington Corridor Project
Renovation
Post-Bid
Rocky Mount, NC 27804

Home Repair Project
Results
Rocky Mount, NC 27804

Housing Services 2020 CDBG-NR Neighborhood Revitalization Project
Renovation
Post-Bid
Whitakers, NC

East Grand Property Demolition
Demolition - 2,500 SF
Results
Rocky Mount, NC 27801

Housing Repair Project 7 Properties
Renovation
Post-Bid
Rocky Mount, NC 27801

Housing Repair and Urgent Repair 5 Properties
Results
Rocky Mount, NC 27804

Housing and Urgent Repair Project 7 Properties
Renovation
Post-Bid
Rocky Mount, NC 27804

Last Updated 03/17/2022 09:22 AM
Project Title

Urgent and Housing Repair 7 Properties

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27803 (Edgecombe, Nash Counties)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: a. Contractors are to include all overhead and profit in the individual items. b. Owner, after careful review, understands and accepts the scope of work described and has initialed and dated each page of the work write up. c. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up. d. Contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appear within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether due to the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, contractor shall furnish owner with all manufactures and supplier’s written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty. e. Remove from site all construction materials, tools and debris. Sweeps clean all exterior work areas. Vacuum all interior work areas, removing all visible dust, stains, labels and tags. f. All painting must be of the highest quality. The surfaces must be prepared and inspected before painting. g. The primer and topcoats must be the same tint. h. Paint and Primer shall be the following or approved equal: ? Sherwin Williams “Super Paint”, “Resilience”, “Duration” or “Emerald”

Details

Single-Family Homes, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents