Similar Projects
Bird River Channel Improvements
Alteration
Results
$1,000,001 to $2,500,000 est. value
Towson, MD

Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland
Post-Bid
$1,000,000 to $5,000,000 est. value
Chesapeake Beach, MD

Maintenance Dredging of Cape Henry Channel (VA), Baltimore Harbor and Channels
Design
$10,000,000 to $25,000,000 est. value
Baltimore, MD

Franklin Manor Dredging
Results
$250,000 to $500,000 est. value
Annapolis, MD

Yacht Basin Dredging Project
Infrastructure
Results
Havre de Grace, MD

Lower Wicomico River Maintenance Dredging, Wicomico County, Maryland
Post-Bid
$1,000,000 to $5,000,000 est. value
MD

FY21-22 Baltimore Harbor and Channels Maintenance Dredging
Results
$10,000,000 to $25,000,000 est. value
Baltimore, MD 21202

Maintenance Dredging of Cape Henry Channel (VA), Baltimore Harbor and Channels
Term Contract
Post-Bid
Less than $20,000,000 est. value
Baltimore, MD 21202

Structural Maintenance and Dredging Services for the Inner Harbor
Infrastructure
Results
Baltimore, MD

Hurst Creek Resiliency and Dredging Project
Infrastructure
Post-Bid
MD

Sewell`s Orchard Pond Retrofit
Infrastructure
Bidding
$100,000 to $500,000 est. value
Columbia, MD 21046

Brighton Dam Dredging Project
Infrastructure
Results
$1,508,000 est. value
Laurel, MD

Deep Creek Headwaters and Cove Dredging
Infrastructure
Results
$250,000 to $500,000 est. value
Annapolis, MD

Fy21 Maintenance Dredge, Baltimore Harbor and Channels
Design
$10,000,000 to $25,000,000 est. value
Baltimore, MD

Last Updated 03/09/2022 08:09 AM
Project Title

Jack Creek Park Dredging Material Beneficial Use

Physical Address View project details and contacts
City, State (County) Shady Side, MD 20764   (Anne Arundel County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $431,788
Plans Available from County Agency - 01/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: 1) Establishing and maintaining necessary sediment and erosion control practices and access roads at both the Idlewilde excavation site and Jack Creek placement site. 2) Preparation of the Jack Creek Park placement site; including, stripping and stockpiling approximately 6,375 cubic yards (CY) of topsoil and capping material. 3) Excavation of approximately 15,000 cubic yards (CY) of previously placed dredged material from the Idlewilde DMP Site. 4) Transportation and placement of the excavated material at the Jack Creek Park placement area and maintenance of the roadways between the sites. 5) Application of approximately 340 tons of lime. 6) Conversion of one temporary gabion outlet structure into a rain garden. 7) Placing the stockpiled capping material and topsoil evenly over the graded areas; and 8) Final grading, landscaping and stabilization of disturbed areas, and replacement of the stone dust surface course on the Jack Creek Park access road.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents