Similar Projects
Croom High School HVAC Modernization
Bidding
Cheltenham, MD 20623

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Fort Foote Elementary School - Univent Replacement and Windows and Doors Replacement
Post-Bid
Fort Washington, MD 20744

Maya Angelou French Immersion School HVAC Upgrade
Results
Temple Hills, MD

HVAC Equipment Replacement for College Park Youth and Family Services Facility
Term Contract
Results
College Park, MD 20740

Tayac Elementary School - HVAC Replacement
Post-Bid
$3,000,000 to $4,000,000 est. value
Fort Washington, MD 20744

John S. Toll Physics Infrastructure Piping University of Maryland College Park
Results
College Park, MD

Robert Goddard Montessori School - HVAC Replacement and Building Envelope
Post-Bid
Seabrook, MD 20706

HVAC Services
Results
Hyattsville, MD

J.E. Proctor Building Chiller Replacement
Post-Bid
Bowie, MD 20715

Thurgood Marshall Library HVAC Renovation Project
Results
Bowie, MD

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

HVAC Maintenance and Service
Term Contract
Results
Less than $50,000 est. value
Upper Marlboro, MD 20772

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

HVAC Maintenance and Service
Term Contract
Results
Less than $50,000 est. value
Greenbelt, MD

Reported 12/21/2018 12:00 AM
Project Title

Indoor Air Quality Services

Physical Address View project details and contacts
City, State (County) Upper Marlboro, MD   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide industrial hygiene services to the Board of Education. The types of industrial hygiene services include, but are not limited to: 1. Identify sources of indoor air quality contaminants 2. Analytical testing, data evaluation, and detailed reports 3. Investigate HVAC system design and operation relating to IAQ issues 4. Identify pollutant sources / pathways and driving forces that may contribute to poor air quality 5. Management of media and building occupants 6. Project management of remediation projects to include the development of plans and specifications 7. Basic indoor air quality investigations 8. Environmental issue specification preparation 9. Failed and/or moldy chilled water pipe insulation evaluation and /or project design, monitoring and installation oversight during removal and reinstallation. Contract Term: The anticipated terms of this contract shall be two (2) years. The term of renewal shall not exceed two (3) additional one (1) year periods.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents