Similar Projects
Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Conception
$150,000,000 CJ est. value
Goodyear, AZ 85338

Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Site 20 New Reservoir Construction - Town of Gilbert
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Citywide Civil Site Work
Infrastructure
Results
Peoria, AZ 85345

Replacement Well Drilling
Infrastructure
Results
$5,500,716 CJ est. value
Mesa, AZ 85201

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Ono Hawaiian BBQ / Phoenix
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Phoenix, AZ 85037

Southern Avenue and Country Club Drive Intersection Improvements - City of Mesa
Infrastructure
Pending Verification
$27,148,555 CJ est. value
Mesa, AZ 85201

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

dupe The Hub At 202 - Phase 2
New Construction, Infrastructure - 918,207 SF
Design
$99,000,000 CJ est. value
Mesa, AZ 85212

Monterey Park Expansion
Infrastructure
Post-Bid
$5,729,645 CJ est. value
Mesa, AZ 85201

Last Updated 04/14/2023 11:35 AM
Project Title

Signal Butte Water Treatment Plant Expansion GMP

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85201   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Expansion of the existing 24 mgd water treatment plant to 48 mgd capacity, including replacing and adding raw water flow control valves, one added raw water ozone contactor, two additional ballasted flocculation trains, one additional intermediate ozone contactor, six additional deep-bed biological GAC filters, one additional finished water reservoir, one additional 8 mgd falcon field zone finished water pump, three 11 mgd desert wells zone finished water pumps, a sludge flow splitter, one wash water treatment unit, one gravity thickener, one ozone generator, additional chemical feed equipment and storage capacity, and a new storage building Pre-Bid RFI and Check to Specs must be received by March 31, 2023, at 5:00 PM. RFIs received after that time may not be addressed prior to the Bid Date.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents