Similar Projects
RFP - Consultant Services for Sheehan High School Outdoor Track and Field Improvements
Infrastructure
Conception
$1,900,000 CJ est. value
Wallingford, CT 06492

Storm Drainage Improvements - Town of Madison
Infrastructure
Conception
$500,000 est. value
Madison, CT

Coliseum Redevelopment - Phase 1
New Construction, Infrastructure - 16,000 SF
Design
$75,000,000 CJ est. value
New Haven, CT 06510

Coliseum Redevelopment - Phase 1
New Construction, Infrastructure - 16,000 SF
Design
$75,000,000 CJ est. value
New Haven, CT 06510

Columbus Park Upgrades
Infrastructure
Bidding
$200,000 CJ est. value
Meriden, CT 06451

Columbus Park Upgrades
Infrastructure
Bidding
$200,000 CJ est. value
Meriden, CT 06451

Paving Services
Infrastructure
Post-Bid
Prospect, CT 06712

West End Streetscape Improvements Phase IV
Infrastructure
Post-Bid
East Haven, CT

Pavement Preservation Surface Courses
Results
Meriden, CT

Paving Services for Middlebury Elementary School
Infrastructure
Results
Middlebury, CT 06762

Water Pollution Control Facility Service Building Replacement
Demolition, New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Waterbury, CT 06708

Carmax
Renovation - 9,141 SF
Construction
East Haven, CT 06512

Trolley Pointe
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Derby, CT 06418

Savin Rock Conference Center Brewery Redevelopment
New Construction, Infrastructure - 52,000 SF
Pending Verification
$25,000,000 CJ est. value
West Haven, CT 06516

Madison Center Project - Phase II - Town of Madison
Infrastructure
Conception
$1,000,000 CJ est. value
Madison, CT 06443

Last Updated 10/27/2022 03:05 AM
Project Title

Autozone #5551 / Waterbury

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06706   (New Haven County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been awarded.* *The Editorial Content team has obtained construction timeline information and construction documents directly from AutoZone

Details

1 Story Above Grade, 7,147 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents