Similar Projects
Y--NGWSP Pumping Plants 2&3
New Construction
Bidding
$50,000 to $100,000 est. value
Shiprock, NM

Band Replace Sewer and Water System
Post-Bid
$500,000 to $1,000,000 est. value
Los Alamos, NM 87544

Ranchitos Lift Station
New Construction
Post-Bid
Santa Ana Pueblo, NM

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Detention Center Lift Station Improvement
Results
$226,694 est. value
Las Vegas, NM 87701

Goat Summit Booster Station
Post-Bid
Mescalero, NM

NMDOT Lift Station Improvement
Results
$313,741 est. value
Las Vegas, NM 87701

Lift Stations and Forcemains
New Construction
Post-Bid
Ruidoso, NM 88345

Dee Bibb Lift Station Improvement
Results
$258,500 est. value
Las Vegas, NM 87701

Sewer Lift Station and WWTP Pump Systems-Operation, Maintenance and Training Services
New Construction
Post-Bid
Los Alamos, NM

Glenwood Gila Trout Facility
New Construction
Results
Glenwood, NM

County Waterline Extension
New Construction, Infrastructure
Post-Bid
Santa Fe, NM

First Street Pond and Wastewater Pump Station
New Construction
Results
$1,034,108 est. value
Grants, NM

Village Lift Station and Forcemain Rehabilitation
Renovation
Post-Bid
$2,400,000 est. value
NM

Improvements to Municipal Well #9 Project
New Construction
Results
Clayton, NM

Last Updated 05/19/2022 11:02 AM
Project Title

Vado Lift Station #7 Improvements

Physical Address View project details and contacts
City, State (County) NM   (Dona Ana County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,690,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the rehabilitation of Vado Lift Station 7 which includes new submersible pumps, stainless steel piping, floats, accessories, and power/control panels, new access hatches, electrical work, generator, odor control system, and chain-link fencing. As part of this contract, 30 residential sewer service connections will be made to the DAC Utilities Sleepy Farms Wastewater collection system, and their existing septic tanks will be decommissioned to minimize the potential of groundwater contamination.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents