Similar Projects
High School Library
Renovation - 10,000 SF
Design
$1,500,000 est. value
Clayton, MO 63105

District-Wide Building Automation System Modernization Project
Renovation
Design
$1,500,000 est. value
Byrnes Mill, MO 63025

Refrigerator Replacement
Term Contract
Sub-Bidding
Chesterfield, MO 63017

Parkway Roof Projects
Renovation
Sub-Bidding
$700,000 CJ est. value
Manchester, MO 63011

Concrete Slabs and Other Related Materials
Post-Bid
Saint Louis, MO

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

2021 Concrete Slab Replacement
Results
Crestwood, MO 63126

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

Ritenour High School Toilet Room 211
Renovation
Post-Bid
Saint Louis, MO 63114

Normandy High School Secured Connector
Addition - 25,878 SF
Results
Normandy, MO 63121

Concrete Repair and Restoration
Alteration
Post-Bid
Saint Ann, MO 63074

Summer 2021 Building Renovations and Site Improvements
Renovation
Results
MO

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

West High Electrical Substation Pre-Purchase
New Construction
Results
Ballwin, MO 63011

Press Box Renovation
Renovation
Post-Bid
Saint Louis, MO

Last Updated 07/28/2022 02:01 PM
Project Title

Ritenour Middle School Science Room 227 RENOVATION - Ritenour School District

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63114   (Saint Louis County)
Category(s) Education, Single Trades
Sub-Category(s) Concrete, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $46,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes removal and repair or replacement of existing base cabinets, removal of water, drain, electrical and gas connections, flooring repair or replacement and painting in RMS Room 227. The scope of work includes removal and repair or replacement of existing base cabinets, removal of water, drain, electrical and gas connections, flooring repair or replacement and painting in RMS Room 227. The Project Schedule calls for work to commence after Thursday 26 May 2022, the last day of school and completed before Monday 8 August 2022. Access to buildings, parking areas and driveways not a part of construction must be maintained for the project duration.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents