Similar Projects
HMA Resurfacing Including HMA Surface
Infrastructure
Bidding
$208,522 est. value
Oglesby, IL

HMA Roadway Improvements on East Railroad Avenue
Infrastructure
Bidding
$300,000 est. value
Leland, IL 60531

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Curb Replacement
Post-Bid
Ottawa, IL

Deck Patching, Latex Overlay, Concrete Repairs
Results
IL

Spring Street Roadway and Storm Sewer
Results
Less than $399,356 est. value
Streator, IL 61364

HMA Removal and Resurfacing
Infrastructure
Post-Bid
Marseilles, IL

Roadway Improvements
Results
Streator, IL

2021 TIF Street Program - Burlington Street Curb Repair and Welland Road Pavement Replacement
Infrastructure
Post-Bid
Mendota, IL

2021 Paving Improvements at Multiple Schools
Results
Ottawa, IL 61350

Seal Coat
Infrastructure
Post-Bid
Rutland, IL

The Intersection of US 6 and IL 178, North of Utica in LaSalle County and Consists of the Reconstruction of the Existing Intersection into a PCC Roundabout
Results
IL

Lynnwood Subdivision Street Program
Infrastructure
Post-Bid
La Salle, IL

3P Milling and Resurfacing (Design Overlay), Spot Guardrail Improvement and Minor Drainage Improvement
Results
IL

Rowe Street and Various
Infrastructure
Post-Bid
$8,351,000 est. value
Sheridan, IL

Last Updated 06/22/2022 01:26 AM
Project Title

Milling and Resurfacing of Mainline, Pavement Marking, and Raised Reflectors

Physical Address View project details and contacts
City, State (County) Baker, IL 60531   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STPB3B7(212) County(s) LaSalle Key Route(s) FAP 68 Marked Route(s) US 34/ IL 23 Section(s) (17)RS-2 State Job #(s) C-93-039-15 PPS #(s) 3-03450-0030. This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents