Similar Projects
Crown Coliseum Ice System Replacement
Results
NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Bidding
Fayetteville, NC 28304

Gray`s Creek Elementary School, Hut Demolition
Demolition
Results
Less than $3,800 est. value
Hope Mills, NC 28348

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC 28301

Demolition Residential Property at Various Locations
Demolition
Results
Less than $26,000 est. value
Fayetteville, NC 28303

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

Demolition Of 854 E Orange Street
Post-Bid
Fayetteville, NC

Abatement, Demolition and Restoration Services for Hazard Mitigation Grant Program
Demolition
Results
Less than $386,015 est. value
Fayetteville, NC

Lot Cleaning, Asbestos Abatement and Demolition of 940 Waterless Street
Demolition
Post-Bid
Fayetteville, NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Post-Bid
Fayetteville, NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Less than $57,000 est. value
Fayetteville, NC 28302

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

Demolition of Residential Structures
Demolition
Post-Bid
Fayetteville, NC 28303

Last Updated 02/19/2019 05:07 PM
Project Title

Lot Cleaning, Asbestos Abatement and Demolition

Physical Address View project details and contacts
City, State (County) Fayetteville, NC   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Demolition and removal of all structures, accessory structures, well/pump houses, old fencing, walls, signs, foundations, basements, pools, footings, walkways, steps and slabs on the parcel 2. All costs associated with the abatement of all identified Asbestos Containing Materials by a licensed contractor 3. Contractor shall obtain at his/her expense all required permits, licenses, bonds, insurance, reports, designs, engineering and/or inspections. 4. Removal of all rubbish, trash and debris, tall weeds, tall grass and undergrowth from the entire site including cut limbs, logs, downed trees and organic debris piles. 5. Disposal of all debris at approved landfills or processing sites 6. Unless specified, asphalt or concrete parking surfaces and driveways are to remain 7. If necessary, approved fill must be added to bring excavated areas to the grade of the existing lot 8. Disturbed areas of the lot must be smooth and graded to allow for proper natural drainage 9. All work must be completed within 60 calendar days after notice to proceed has been issued unless otherwise stated. Contractor is responsible for contacting City for inspection upon completion. 10. With the exclusion of lawful asbestos removal, contractor shall not assign, subcontract, or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) the Agreement without the written consent of owners. 4309 Bragg Boulevard commercial building and trailers. Parcel ID 0418-55-5465
Details
Division 02 - Existing Conditions, Demolition, Asbestos Remediation, Asbestos Abatement.
Division 41 - Material Processing and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents