Similar Projects
New SCADA System - City of Sea Isle City
Renovation
Conception
$1,000,000 CJ est. value
Sea Isle City, NJ 08243

Energy Resilience Bank (ERB) Black Start Project
Renovation
Bidding
$300,000 CJ est. value
Little Ferry, NJ 07643

Contract 3 Fortescue Wastewater Treatment Plant
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Downe, NJ 08349

Furnishing and Delivering Sodium Hypochlorite
Term Contract
Post-Bid
Long Branch, NJ

PFAS Removal Treatment System - Phase 2
Renovation
Post-Bid
Newton, NJ

Stage V - Miscellaneous Wastewater Treatment Plant Improvements
Renovation
Results
$974,118 est. value
NJ

Odor Control Systems Service Contract
Infrastructure
Results
Pennsauken, NJ

Low Lift Pump Station, Control House and Old Administration Building Stone Pointing and Waterproofing
Renovation
Construction
$260,000 CJ est. value
Wanaque, NJ 07465

Water Pollution Control Facility - Disc Filters
Renovation, Infrastructure
Construction
$1,067,000 CJ est. value
Livingston, NJ 07039

Levine Reservoir Water Tanks Phase I
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Paterson, NJ 07501

Suez Water New Jersey Treatment Plant
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Franklin Lakes, NJ 07417

Water Treatment System Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Ho Ho Kus, NJ 07423

Wastewater Treatment Plant Improvements Replacement of Rotating Biological Contactors
Renovation
Post-Bid
Pennsville, NJ 08070

2022 Maintenance Contract Sewer Treatment Plant
Infrastructure
Results
Palmyra, NJ

Water Street Water Treatment Plant Upgrades
New Construction, Infrastructure
Bidding
$11,500,000 CJ est. value
Pennsville, NJ 08070

Last Updated 03/06/2023 08:38 AM
Project Title

Morris Lake Water Treatment Plant (WTP) Chemical Room Rehabilitation

Physical Address View project details and contacts
City, State (County) Newton, NJ 07860   (Sussex County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $268,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

* Per owner, this contract has been canceled. Rebid details pending. In general, the principal items of work under this Contract include, but are not necessarily limited to, the following: All work required to remove the existing piping, storage tanks, day tanks, pipe supports, pumps and equipment, equipment supports, as necessary, measure and layout the work, and replace same in the Sodium hypochlorite, Caustic soda and Zinc orthophosphate Rooms. Note existing pumps and equipment are to be reinstalled. All work required to layout and install a temporary chemical feed systems for the aforementioned chemicals. All work required to prepare and paint all steel surfaces. All work required to clean and prep the concrete and masonry surfaces and perform the required concrete/masonry repairs. o All work required to paint the aforementioned rooms in their entirety. Upon confirmation of proper operation by the Town of Newton Water & Sewer Utility staff, all work required to restore the site to its pre- work condition. Submission of Bid: All bids must be submitted on the bid proposal forms approved and provided for by the bid specifications in order to be considered. Bid proposals must be accompanied by a certified check, cashier's check, or bid bond in the amount of ten percent (10%) of the total amount of the bid, but not in excess of twenty thousand ($20,000) dollars, and made payable to the Town of Newton. Bidder Requirements: Bidder must comply with the requirements of NJSA 10:5-31 et seq., and NJAC 17:27. Other requirements as well as those described above are fully detailed in the bid document. Bidders shall familiarize themselves with the requirements of Article No. 28 (Substitutions) of the General Conditions as it pertains to the utilization of approved equal equipment or material. Bidders under this Contract shall follow, State guidelines for the minimum wage rates and conditions of employment. Completion Date: 120 Calendar Days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents