Similar Projects
University View Academy
Renovation - 10,800 SF
Design
Baton Rouge, LA 70808

New Replacement of Lafayette High School
Renovation
Bidding
Lafayette, LA 70506

Yokum Road School Renovations
Renovation
Bidding
Hammond, LA 70403

St. Bernard Christian Academy
New Construction - 40,239 SF
Post-Bid
Meraux, LA 70075

Sulphur 9th Grade School
Renovation
Post-Bid
Calcasieu, Sulphur, LA 70663

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

Vermilion Parish School Board Renovations
Renovation
Results
Abbeville, LA

Great Hearts Charter School - South
New Construction - 35,376 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Great Hearts Charter School - North
New Construction - 70,607 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

New West Baton Rouge Student Services Building
New Construction
Bidding
Port Allen, LA

Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

NPSB (2) 68x24 Classroom Trailers
New Construction
Bidding
Natchitoches, LA

Hurricane Repairs Vinton Middle School
Renovation
Post-Bid
Vinton, LA

Hackberry High School Restoration Phase II
New Construction
Bidding
Lake Charles, LA 70607

Hurricane Laura Repairs - A.M. Barbe/SJ Welsh - Sports Fields and Building Repairs
Renovation
Post-Bid
Lake Charles, LA

Reported 09/10/2021 12:00 AM
Project Title

Jonesboro Hodge High School Auditorium Renovation

Physical Address View project details and contacts
City, State (County) Jonesboro, LA 71251   (Jackson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of removing existing seating, flooring & base, ceiling tiles and lighting in the auditorium and replacing them with new. Most rooms will receive new paint on all previously painted walls. New flooring and base will also be installed in the dressing rooms, stairs, vestibules and props storage rooms.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents