Similar Projects
PA State Police Academy and BESO - Modernization
Design
Less than $191,825,000 est. value
Hershey, PA 17033

PA State Police Academy and BESO - Modernization
Design
Less than $191,825,000 est. value
Hershey, PA 17033

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Roofing, Facade, and Building Envelope Engineering and Design Services
Alteration
Design
$2,500 to $6,000,000 est. value

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Indefinite Delivery /Indefinite Quantity (IDIQ), Multi-Discipline Architect-Engineer (AE) Services in support of Public Works Department, Pennsylvania
Post-Bid
Less than $7,500,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Cashless Tolling Design for New Open Road Toll (ORT) Zones
Post-Bid

Last Updated 09/12/2022 08:35 AM
Project Title

RFP Design - Airport Access Control System Replacement

Physical Address View project details and contacts
City, State (County) Middletown, PA 17057   (Dauphin County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Susquehanna Area Regional Airport Authority ("SARAA") is requesting proposals from qualified firms with experience in access control systems and the development of related purchase bid specifications. SARAA is seeking proposals from firms to review and assess the current access control system at Harrisburg International Airport for operational capabilities, including hardware, software, and related components, and the development of bid specifications for a replacement access control system. The final product will allow SARAA to issue a bid specification in the future for the installation of a replacement airport access control system. The current airport access control system includes approximately 163 card readers including doors (some with delayed egress and some with motion sensors), baggage belts, 6 elevators, 7 remote vehicle gates, 27 panels, a CCTV system, remote panic buttons, and an airport identification badging system. All questions about the process and procedure may be directed to Belinda Svirbely, Deputy Director, Operations, Security & Public Safety by e-mail at BelindaS@SARAA.org. All questions related to the substance of the RFP shall be submitted to Ms. Svirbely in writing (either by e-mail or U.S. mail) and received no later than Tuesday, September 6, 2022. Any answers will be posted as an addendum on the website referenced above no later than close of business on Friday, September 9, 2022. SARAA will make the final selection of the firm or team of firms to perform the proposed services. SARAA reserves the right to cancel any and all solicitations and to accept or reject, in whole or in part, any and all proposals when it is in the best interest of SARAA as determined by SARAA in its sole discretion. Proposals will be valid for 90 days as of being submitted to SARAA. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents