Similar Projects
HVAC Preventative Maintenance East Grand Rapids
Bidding
Kent City, MI

2021 Kent ISD KTC Roof Replacement
Bidding
Grand Rapids, Kent City, MI 49525

Partial Reroofing Services
Post-Bid
Grand Rapids, MI

Lincoln Campus Power Plant Roof Renovation
Post-Bid
Grand Rapids, MI

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Rockford Public Schools Meadow Ridge and Maintenance Re-Roofing
Results
Rockford, MI

High Tension Fabric Shelter - Used
Bidding
Kent City, MI

2020 Kent ISD Lincoln Developmental HRU Repairs
Post-Bid
Grand Rapids, MI

Roof Replacements - Parks
Results
Caledonia, Grand Rapids, Wyoming, MI 49315

Sparta Area School Roof Replacement
Post-Bid
Sparta, MI 49345

Air Handler Replacement - Correctional Facility Locker Room
Results
Grand Rapids, MI 49503

Roofing Envelope Services
Post-Bid

HVAC Controls Replacement Commodore Replacement
Results
Grand Rapids, MI 49503

Bleachers and Vertical Unit Ventilators
Post-Bid
Caledonia, MI

HVAC System - Casnovia Community Center
Results
Less than $42,450 est. value
Grand Rapids, MI 49503

Last Updated 01/03/2020 04:19 PM
Project Title

Residential Home Roof and HVAC Improvements

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI   (Kent County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dimensions, if furnished, are for general reference only and should be verified by Respondents. 1. Roofing - Tear off and Reroof Shingles on House and Garage: • Remove and dispose of all roofing and defective sheathing • Cut a 1” wide vent at ridge board • Replace up to 5 square feet of sheathing per 100 square feet of roof using pine board or CDX plywood of matching thickness • Staple 15lb felt • Install preformed white aluminum, drip edge, and vent pipe boots • Install a 220lb fiberglass asphalt, 3-tab architectural shingle with a 25 year warranty • Replace all flashing • Install shingle-over ridge vent. • Install to code Close-in Inspections will be required for roofing. Respondent must call the agency for inspection of all work that will be concealed from view before it is closed in. This type of inspection frequently includes, but is not limited to • Footings, roof sheathing and flashing prior to installation of new felt and shingles • Repaired framing and decking prior to installation of underlayment • Floor coverings prior to installation of drywall 2. HVAC – Replace Central A/C Unit • Submit manufacturer cut sheet and cooling load calculation for proposed equipment to owner at least 15 working days prior to install • Remove existing A/C equipment to legal dump • Install central A/C system with minimum EER of 8.6, including condensing unit, A type evaporator coils, control and power wiring, insulated freon lines, plenums, ext pad and necessary connections to create complete install. • Provide owner with factory warranty, manual, and 1-year contractor warranty

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents