Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895 - City Of Dubuque
Infrastructure
Conception
$305,800 CJ est. value
Dubuque, IA 52002

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Peosta Community Center Improvement Project
Demolition, New Construction, Build-out, Renovation, Infrastructure - 6,700 SF
Bidding
$750,000 CJ est. value
Peosta, IA 52068

Bee Branch Stormwater Pumping Station Project
Demolition, New Construction, Infrastructure
Post-Bid
$15,780,000 CJ est. value
Dubuque, IA 52001

Lead Hazard Control 2839 Elm Street
Term Contract, Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
Dubuque, IA 52001

Water System Improvements 2021
Infrastructure
Results
$427,000 est. value
Dubuque, IA

Utility Extension 2022 Contract A Road Water Main
Term Contract
Results
$230,000 est. value
Dyersville, IA

Five Flags Building Improvements - City of Dubuque
Renovation, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Dubuque, IA 52001

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Comiskey Park Redevelopment Project
Infrastructure
Post-Bid
$1,541,300 CJ est. value
Dubuque, IA 52001

Asbury Springreen Drive South and Sunset Drive Reconstruction
Infrastructure
Results
$2,000,000 est. value
Asbury, IA

North Cascade Road Reconstruction - City of Dubuque
Infrastructure
Conception
$1,200,000 CJ est. value
Dubuque, IA 52003

2023 Epworth High School Additions
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Epworth, IA 52045

Last Updated 11/15/2022 01:04 PM
Project Title

Dyersville East Utility Extension 2022 Contract E Water and Sewer

Physical Address View project details and contacts
City, State (County) Dyersville, IA 52040   (Dubuque County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work involved in the project consists of the installation of water main and sanitary sewer main on the Field of Dreams site. The project includes the installation of approximately 9,200 lineal feet of 12-inch water main and water main appurtenances and approximately 7,300 lineal feet of sanitary sewer mains ranging in size from 8 to 12 inches. Time for Commencement and Completion of Work Work on the improvement shall commence on or before the date specified in the written "Notice to Proceed". Following are the completion dates: - Substantial completion of Phase I segment shall be April 15, 2023 - Substantial completion of Phase II segment shall be June 30, 2023 - Substantial completion of Phase III segment shall be completed prior to March 31, 2023, or it can be constructed between November 1, 2023 and March 31, 2024 - Final completion shall be April 15, 2024 Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that the work remains uncompleted after the end of each of the substantial completion dates. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that the work remains uncompleted after the end of the project completion date, with due allowance for extension of contract period due to conditions beyond the control of the Contractor, as approved by the City Council. Bid Security Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8 and as specified by the City of Dyersville, Iowa. The bid security shall be 10% of the total amount of the bid. Preference for Iowa Products By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa to the extent lawfully required under Iowa statutes. Sales Tax The bidder should not include sales tax in the bid. Sales tax exemption certificates will be issued in accordance with Iowa Code 423.3, subsection 80, and provided to the contractor and subcontractors for all material purchased for incorporation in the project. Bidder Status Form Under Iowa law, Bidders are required to submit the Bidder Status Form that follows the Bid Form in the specifications. Failure to provide the form with the bid may result in the bid being deemed nonresponsive. This may result in the bid being rejected by the Owner. Warranty Period The improvements shall be kept and maintained in good repair for a period of two (2) years after final acceptance of the project by the Owner. General Nature of Public Improvement The extent of the work involved in the project consists of the installation of water main and sanitary sewer main on the Field of Dreams site. The project includes the installation of approximately 9,200 lineal feet of 12-inch water main and water main appurtenances and approximately 7,300 lineal feet of sanitary sewer mains ranging in size from 8 to 12 inches. Bid Tabulation - The bid totals will be available at and after the public bid opening. However, an itemized bid tabulation will not be publicly available until after the Owner awards the contract. Funding Agency Requirements This project has been awarded a Water Infrastructure Fund (WIF) through Iowa Finance Authority. WIF is funded from Iowa's allocation of Coronavirus State and Local Fiscal Recovery Funds from the American Rescue Plan Act (ARPA). Davis-Bacon prevailing wage rates and reporting requirements will apply to this project and are included in this specification or will be provided in an addendum. The City of Dyersville hereby reserves the right to reject any or all bids and to waive informalities and irregularities and award a contract as deemed to be in the best interest of the city.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents