Similar Projects
Last Updated | 11/02/2021 02:32 PM |
Project Title | Chip Sealing |
Physical Address | View project details and contacts |
City, State (County) | WI (Jefferson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Chip sealing the following town roads: 1. Junction Road, from Dewey Road to the Aztalan / Farmington town line, right before the culvert / bridge. 1/2 mile. 2. Dewey Road, From intersection of Junction Road to just past Vogel Lane. 4/10 mile. 3. Gehler Road, entire road from Ziebell Road to Popp Road. 1.28 miles 4. Gross Lane, (off Gehler) Gehler to dead end. .26 miles 5. Gordy Lane, (off Gehler) Gehler to dead end. .17 miles. Estimates shall include any costs associated with applicable prep work such as pre-cleaning the road surface. Fractured stone chips are required. Adequate oil and spread rate for proper adhesion. Measurements are close but should be verified by bidder per markings on road, stakes on shoulder or land marks as listed |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |