Similar Projects
2022 Crack Seal
Infrastructure
Post-Bid
$60,000 CJ est. value
Louisburg, KS 66053

2022 Crack Seal
Infrastructure
Post-Bid
$60,000 CJ est. value
Louisburg, KS 66053

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Grading and Surfacing. Hedge Ln 0.8 Mi n Of 383rd St Over Bnsf In Mi Co. Lgth Is 0.160 Mi
Infrastructure
Results
KS

Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Results

K-68 - Grading and Surfacing
Infrastructure
Results
KS

K-68 - Grading, Bridge and Surfacing
Infrastructure
Results
KS

K-68 - Milling and HMA Overlay
Infrastructure
Results
KS

US-69 - Overlay
Infrastructure
Results
KS

Overlay - US 169
Infrastructure
Results
KS

Milling and HMA Overlay
Infrastructure
Results

Crack Repair
Infrastructure
Results
KS

Grading and Surfacing
Infrastructure
Results
Louisburg, KS

2022 Street Improvements
Infrastructure
Results
$300,000 est. value
Louisburg, KS

Phase 1 Culvert Replacements
Infrastructure
Results
$825,751 CJ est. value
Paola, KS 66071

Last Updated 09/22/2022 04:06 PM
Project Title

Quivira Road: 183rd Street to 187th Street - TH-1147 - City of Overland Park

Physical Address View project details and contacts
City, State (County) Overland Park, KS 66013   (Miami County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected December 2025
Bids Due View project details and contacts
Estimated Value $2,940,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Quivira Road from 179th Street to 187th Street to standard two lane. A portion of Quivira Road between 183rd St. and 187th St. does not currently exist and will be connected with this project. This project was included in the City's Municipal Services Extension Plan for the 2008 annexation. This project is included in the city's FY 2023-2027 Capital Improvement Program. As of September 22, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents