Similar Projects
BSL 3 Laboratory HVAC and Controls Renovation
Renovation, Alteration
Bidding
Kissimmee, FL 34741

N059--FY20: Hot Deck Replacement
Post-Bid
Gainesville, FL 32608

Kitchen Exhaust Hood Cleaning Services
Post-Bid
FL

Annual Chiller and Cooling Tower Maintenance Service Program
Term Contract
Results
Gainesville, FL 32601

Heating, Ventilation and Air Conditioning (HVAC) Replacement - North Region
Results

Air Conditioning System Replacement
Post-Bid
Gainesville, FL 32641

HVAC Air Filtration Services
Term Contract
Results
FL

J041--Refurbish Air Handler Units
Post-Bid
Gainesville, FL

HVAC Replacement/Installation
Results
Gainesville, FL 32609

HVAC and Mechanical Products
Term Contract
Post-Bid

Air Handling Unit Replacement at Fine Arts D
Results
Gainesville, FL 32601

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

4120--Vertical AC Units
Results
Gainesville, FL 32608

H341--Clean Air Handling Units (AHUs) and Heat Recovery Units
Post-Bid
Gainesville, FL

HVAC Water Systems Treatment (District-Wide)
Results
Alachua, Gainesville, High Springs, Newberry, FL

Reported 07/20/2021 12:00 AM
Project Title

4120--Replacement of AHU-24 Fan & Coil Compartment

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A qualified contractor must be brought in to provide a turn-key replacement of existing AHU-24 blower and coil compartment between existing Outside Air (OA) and Return Air (RA) mixing plenum/pre-filter racks and the discharge air plenum/final filter racks. Remove all pneumatic controls and install new DDC controls connected to existing Siemens Desigo BAS via field panel installed in the mechanical space that houses the AHU. Require the existing 3-way CW control valve be replaced with a 2-way CW control valve and associated piping reconfigured to connect to new AHU-24. Require existing pneumatically controlled steam valve be replaced with a DDC control valve and associated steam piping be reconfigured to connect to the new AHU-24. Provide necessary VFD for control of a fan wall array in the new AHU.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents