Similar Projects
Last Updated | 06/03/2020 05:12 PM |
Project Title | Elk Ridge Oak Lane Booster Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Elk Ridge, UT 84651 (Utah County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of construction of a stick framed booster pump facility, canned booster pumps, connections into an existing concrete water tank, and installation of a new pump line connecting to the existing water system. The project is located near the intersection of Oak Lane and Hillside Drive in Elk Ridge, UT in Utah County. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |