Last Updated | 01/18/2023 10:33 PM |
Project Title | SW Des Moines Street Parks - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50023 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2022 |
Bids Due | View project details and contacts |
Estimated Value | $332,036 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: Park areas between and along SW Des Moines Street south of SW Magazine Road in Prairie Trail, Ankeny, Iowa. A copy of said plans, specifications, and form of contract, and estimated total cost is now on file at the Ankeny Public Services Building and may be examined at 1210 NW Prairie Ridge Drive, Ankeny, Iowa, 50023. An electronic copy of the Contract Documents is available his fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a reusable condition, and (2) they are returned within fourteen (14) calendar days after the award of the project. You must call 515-963-3576 in advance to reserve a paper copy.Download delivery fee is $0.00 Project Category Code: Landscaping (Planting Projects), Parks, Recreation, Trail Work, Sitework/Excavating and Grading, Parking Lots/Ramps, Signage, Erosion Control - Temporary Description: The 2022 SW Des Moines Street Parks - Phase 1 project includes grading, PCC paving for parking and sidewalks, storm sewer, sanitary and water services, and landscaping for the first phase of a new park in Prairie Trail. Other associated improvements include traffic control, traffic signs, surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the project no later than July 22, 2022. Substantially complete shall be defined as all utility, grading, and pavement construction completed, with the new parking area, driveway, and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). Fully complete shall be defined as all work completed including landscaping and seeding, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Two Hundred Fifty Dollars ($250.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |