Similar Projects
Oak Trace Senior Living Community Phase II
New Construction
Conception
Downers Grove, IL

Recondition and Rebuild Electrical Utility Distribution Transformers
Alteration
Bidding
$500,000 est. value
Naperville, IL

Black Framing Moving Head Light Fixture With Ultra Bright White Light Led Emitting Diode Light Source
Post-Bid
Glen Ellyn, IL

Generator Maintenance
Term Contract
Post-Bid
Saint Charles, IL

BIC - SRC Generator Silencer Replacement
Results
Glen Ellyn, IL 60137

95th Street Community Plaza Phase II Development
Results
Naperville, IL

Pure Hockey
New Construction, Build-Out - 7,886 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Elmhurst, IL 60126

Petkus Property Apartments
New Construction - 4,630 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Valley View, IL 60174

Electrician Installation, Maintenance, Modifications and Repairs
Post-Bid
Naperville, IL

Lighting Fixtures and Components for College of DuPage MAC Belushi Hall Theatrical Stage
Results
Glen Ellyn, IL

LED Lighting Retrofit/Replacement
Post-Bid
Hinsdale, Willowbrook, IL 60527

Emergency and Amber Lighting and Related Equipment
Results
Naperville, IL

Electrical Services
Post-Bid
Aurora, IL

6136 Generator Maintenance
Term Contract
Results
Saint Charles, IL

Electrical Services
Term Contract
Post-Bid
Aurora, IL

Last Updated 07/26/2022 02:12 PM
Project Title

Community Center Memorial Room AV and Stage Lighting Replacement Project

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60189   (DuPage County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Clubhouse/Social Club, Electric
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 26, 2022, all bids have been rejected. A timeline for the rebid has not been established. Wheaton Park District will be receiving sealed bids for the Community Center Memorial Room AV and Stage Lighting Replacement Project. The Wheaton Park District Board of Park Commissioners reserves the right to waive all technicalities, to accept or reject any or all bids, to accept only portions of a proposal and reject the remainder without disclosure for any reason. Failure to make such a disclosure will not result in accrual of any right, claim or cause of action by any Bidder against the Wheaton Park District. Bids shall not include federal excise tax or state sales tax for materials and equipment to be incorporated in, or fully consumed in the performance of, the Work. An Exemption Certificate will be furnished by the Wheaton Park District on request of the Bidder, for use in connection with this Project only. The Work of this Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Illinois Department of Labor for public works projects in DuPage County. The Contract entered into for the Work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform the Work at no less than the prevailing rate of wages (or the prevailing rate for legal holiday and overtime work) for each craft, type of worker, or mechanic. All bid proposals must be accompanied by a bid bond or bank cashier's check payable to the Wheaton Park District for ten percent (10%) of the amount of the bid as provided in the Instructions to Bidders. No proposals or bids will be considered unless accompanied by such bond or check. The Contractor selected will also be required to comply with all applicable federal, state and local laws, rules, regulations and executive orders including but not limited to those pertaining to equal employment opportunity.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents