Similar Projects
Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp
Infrastructure
Conception
$18,340,000 CJ est. value
Whitesburg, KY 41858

Improve Us-119 From North of Ky-15 to Brass Drive (South)
Infrastructure
Conception
$10,060,000 CJ est. value
Whitesburg, KY 41858

Asphalt Resurfacing - Shelby Gap Road
Infrastructure
Post-Bid
$933,177 CJ est. value
Thornton, KY 41855

Water Line Replacement and Water Tank Project - Contracts 1, 2, and 3
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Asphalt Resurfacing
Infrastructure
Results
$932,580 CJ est. value
Thornton, KY 41855

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Fleming, KY 41840

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Jenkins, KY 41537

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Jenkins, KY 41537

Asphalt Paving Contractor
Infrastructure
Post-Bid
$300,000 CJ est. value
Jenkins, KY 41537

Sports Field Services for Earnest Cook Park
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Whitesburg, KY 41858

Road Repairs Using Rail and Cribbing Methods.
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Waterline Improvement Project Phase 2 - Contract 1 Waterline
Infrastructure
Post-Bid
$300,000 CJ est. value
Fleming, KY 41840

Waterline Improvement Project Phase 2 - Contract 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Fleming, KY 41840

Letcher County Emergency Access Culvert Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Letcher County Recreation Center Repairs/replacements From Flood
Infrastructure, Renovation
Post-Bid
$600,000 CJ est. value
Whitesburg, KY 41858

Last Updated 03/01/2023 04:19 PM
Project Title

Burdine Elementary- Flood Renovation

Physical Address View project details and contacts
City, State (County) Jenkins, KY 41517   (Letcher County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Jenkins Independent School District Burdine Elementary project is being bid and constructed utilizing the Construction Management as Constructor (CMc) delivery method of construction contract delivery. Trace Creek Construction will be the CMc for the project under direct contract with the Jenkins Independent Board of Education. Individual bid package contracts will between Trace Creek Construction, Inc. and the successful Individual Bid Package Contractor. The project is generally described as renovation and addition to Burdine Elementary. The work of the project is necessitated because of the flooding event of July, 2022. The project will be bid and constructed according to the. rules and regulation as set forth by the Federal Emergency Agency (FEMA). The project consists of the addition of a new pre-school room addition, new library, sprinkler system and selected electrical/ mechanical improvements. The project is to be completed in 170 calendar days. A 5% bid bond or certified check equal to 5% of the bid, including all alternates, is required to be submitted with the official form of proposal, to Trace Creek Construction, Inc. A 100% payment and performance bond shall be provided for the full base bid amount plus any accepted bid alternate(s), upon receipt of a Notice of Award, to Trace Creek Construction, Inc No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum bid shall not be cause for withdrawal of bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. FEMA DR4663KY The Jenkins Independent School District - Burdine Elementary project is being bid and constructed utilizing the Construction Management as Constructor (CMc) delivery method of construction contract delivery. Trace Creek Construction will be the CMc for the project under direct contract with the Jenkins Independent Board of Education. Individual bid package contracts will between Trace Creek Construction, Inc. and the successful Individual Bid Package Contractor

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents