Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

WWTP Improvements Phase I
New Construction
Bidding
Stevenson, WA 98648

Wastewater Treatment Facility Upgrade
New Construction
Bidding
$16,800,000 to $17,800,000 est. value
Sultan, WA 98294

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

Post Point Sludge Pump System Replacement
Renovation, Addition
Results
$1,100,000 to $1,500,000 est. value
Bellingham, WA 98225

West Point Treatment Plant Primary Sedimentation Tank Coating
Renovation
Design
$3,700,000 est. value
WA

WWTP Improvements Phase I - Major Equipment
New Construction
Post-Bid
Stevenson, WA

Wastewater Treatment Facility Operations Building Restoration
Renovation
Results
$1,500,000 est. value
Bridgeport, WA

Reported 03/16/2022 12:00 AM
Project Title

Waste Water Treatment Plant Outfall Relocation Upland Phase

Physical Address View project details and contacts
City, State (County) Anacortes, WA 98221   (Skagit County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of construction of the upland portion of a new wastewater treatment plant outfall conveying treated effluent from the City’s wastewater treatment plant to Guemes Channel. Significant project elements include: Construction of a 48-inch diameter WWTP outfall from the WWTP to the end of U Avenue. Blasting and excavating rock for several hundred feet of the pipeline alignment at depths up to approximately 30 feet deep. Connection to the “WWTP Outfall Relocation - Marine Phase” outfall. Associated manhole structures. Selective demolition of existing piping and structures including asbestos concrete pipe. Roadway restoration. Testing and assistance during commissioning of new facilities. Connection of the new 48-inch pipeline to the existing 30-inch WWTP outfall. Surface restoration of the pipeline alignment. Payment of all associated taxes and fees. Limiting construction impacts to traffic and residences.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents