Similar Projects
St. Mary Of Carmel Catholic School
New Construction
Design
Dallas, TX 75212

Parish Episcopal School Performing Arts Center
New Construction - 55,000 SF
Design
$20,000,000 est. value
Dallas, TX 75244

Career Institute at North Campus - Renovation
Renovation
Bidding
$500,000 est. value
Dallas, TX 75231

Career Institute at Village Fair - Renovation
Renovation
Bidding
$500,000 est. value
Dallas, TX 75231

RL Turner High School and Vivian Field Middle School Renovations and Additions
Renovation, Addition
Sub-Bidding
Carrollton, TX 75006

Richardson ISD Liberty JHS and Apollo JHS Renovations
Renovation
Sub-Bidding
Richardson, TX 75081

Lake Highlands High School Addition and Renovations
Renovation, Addition
Post-Bid
Addison, TX

Little Elm ISD Strike Middle School
Post-Bid
Addison, TX

Multi-Campus Renovations
Results
$1,530,333 est. value
Garland, TX

Coyle Middle School Fine Arts Addition and Renovation
Renovation, Addition
Results
Less than $1,425,000 est. value
Rowlett, TX 75040

Multi-Campus Renovations
Construction
$1,549,000 est. value
Garland, TX

New Natatorium
Construction
$30,100,000 est. value
Garland, TX

Texas Can Academy
Renovation - 11,200 SF
Design
Dallas, TX 75243

Dr. Martin Luther King Jr. Arts Academy Renovation
Renovation
Bidding
Dallas, TX 75219

New Walker Middle School Building Project
Post-Bid
Dallas, TX 75200

Reported 08/15/2019 04:15 PM
Project Title

Franklin D. Roosevelt High School - Additions and Renovations

Physical Address View project details and contacts
City, State (County) Dallas, TX   (Dallas County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced third quarter 2019
Bids Due View project details and contacts
Estimated Value $30,598,359
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Scope item 1: Demolition of existing site conditions for the improvements in conflict with the proposed parking/bus drop-off, fire lanes, library/media center relocation, new competition gym, new cafeteria, kitchen and proposed main entry and secondary entry at the alumni plaza, relocation of the batting cage, and the modification to the existing service entrance drive. Scope item 2: The school campus will consist of new additions to include a new secure entrance, administration addition, special ed classrooms, and CTE addition all housed within 3-stories, new kitchen/cafeteria addition, new competition gymnasium to seat 800, new library/media center, new CTE food lab with an outdoor dining area and a band hall addition to be constructed within a tornado shelter to house the entire school campus. Scope Item 3: The school campus will consist of site improvements to include a new pedestrian bridge to adjoin the new 3-story addition, segmental retaining walls, bus drop-off, add a fire lane, sidewalks, storm sewer, sanitary sewer work, outdoor learning plaza, landscaping/irrigation, and the replacement of selective trees and shrubs that are dead. Scope item 4. The existing school campus will also under go renovations to 26 classrooms and the ROTC program located in the 3-story bar building, renovations to 3 programs in the fine arts department, renovations to both the large gym and small auxiliary gym, renovation of the corridors/stairwells in the 3-story bar building, and modifications to the existing construction to accommodate the new additions tie-in. Scope item 5. The existing school campus will also under go site and building improvements to consist of its exterior spandrel glass system with selective replacement of spandrel glass panes, selective roof replacement, add additional fire protection to include a fire hydrant, upgrade the remaining building fire alarm system to integrate with the new system, and improve the entry to the bridge landing at the Creek to remove the change in elevation at the expansion joint.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents