Similar Projects
Phase 5 - Grading Package for Bridgewater
Bidding
TX

Twinwood Parkway Phase 1B, Segment C-D
Bidding
McKinney, TX 75072

Golf Course Infrastructure Repairs – Phase II
Post-Bid
Plano, TX 75025

Retaining Wall Surface Finish Improvements
Term Contract
Post-Bid
$3,400,000 est. value
Plano, TX 75093

Trinity Falls Melissa Road Grading Package
Results
Melissa, TX 75454

Chapman Raw Water Transmission Pipeline Channel Stabilization at the South Sulphur River Crossing Phase 2
Results
$783,000 est. value
Wylie, TX 75098

DC Ranch Drainage Improvements - Phase 1
Bidding
Celina, TX

Pond Maintenance III
Post-Bid
Plano, TX 75023

Phase 3 Grading Package for Bridgewater
Results
Princeton, TX 75407

Three Cities Trail Gabion Wall and Slope Stabilization
Post-Bid
Frisco, TX 75034

Old Stone Dam Upstream Bank Stabilization
Results
Allen, TX 75013

Pond Maintenance Group 1
Post-Bid
$40,000 est. value
Plano, TX 75025

Allenwood Drainage Improvement at Dart Crossing
Results
Allen, TX 75013

Erosion Control at Various Locations - Phase 3
Post-Bid
Dallas, TX

Mckinney National Airport
Results
McKinney, TX 75069

Last Updated 04/16/2020 04:04 PM
Project Title

NTMWD 121 RDF Intermediate Cover Improvements

Physical Address View project details and contacts
City, State (County) Melissa, TX 75454   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

30.4 acres of intermediate cover grading and constructing 12,000 linear-feet of soil sideslope swales. Grading and swale construction includes excavating, hauling, and placing approximately 20,000 cubic yards of soil material. Hydroseeding newly graded intermediate cover areas. Erosion repair of existing intermediate cover and new intermediate cover with established vegetation and broadcast seeding these areas. Bi-monthly erosion repair and broadcast seeding of existing and new intermediate cover areas for a period of six months. Constructing and extending flexible membrane lined (FML) chutes and swale. Constructing a concrete demudder/low-water crossing.

Details

Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents