Similar Projects
WVU Hospital Master Campus Plan - Phase 3
Addition, Demolition, Renovation, Infrastructure
Conception
$155,000,000 CJ est. value
Morgantown, WV 26505

Sheetz - Charles Town
New Construction - 6,077 SF
Design
Charles Town, WV 25414

Bethlehem Roadwork
Infrastructure
Design
$300,000 CJ est. value
Wheeling, WV 26003

Pleasant St Streetscape
Infrastructure
Bidding
$1,040,386 CJ est. value
Morgantown, WV 26505

Hardy County PSD Building (Public Service District)
New Construction, Infrastructure - 6,000 SF
Bidding
$750,000 CJ est. value
Moorefield, WV 26836

City Hall Parking Lot Renovations
Post-Bid
Elkins, WV

Resurfacing City Streets
Post-Bid
Charleston, WV

AMMA - CO 29 OP
Results
WV

Pavement Rehabilitation
Results
Charleston, WV

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Pending Verification
$20,000,000 CJ est. value
Ranson, WV 25438

Paving Parking Lots 28 and ST5
Infrastructure
Design
$115,070 CJ est. value
Morgantown, WV 26505

Paving the Roadway Between Skyview Elementary and Westwood Middle
Infrastructure
Bidding
$458,000 CJ est. value
Morgantown, WV 26505

Paving at Several Schools
Post-Bid
New Cumberland, WV

Asphalt Rejuvenation Project
Results
Parkersburg, WV

Pocahontas ADA Ramps + 2
Infrastructure
Design
$451,963 est. value
Marlinton, WV 24954

Last Updated 09/19/2022 08:02 AM
Project Title

New Nicholas County Memorial Walking Trail

Physical Address View project details and contacts
City, State (County) Richwood, WV 26261   (Nicholas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The contract type for this project will be a Lump-Sum Single-Prime Contract. This project is federally funded, in part, therefore each Bidder must comply with the REQUIRED CONTRACT PROVISIONS FOR NON-FEDERAL ENTITY CONTRACTS UNDER FEDERAL AWARDS - APPENDIX II TO 2 CFR, PART 200. Each bid shall be accompanied by a bid bond, made payable to the Owner, in the amount of five percent (5%) of the base bid, in accordance with the Instructions to Bidders. Each Bidder must be registered with the West Virginia Department of Tax and Revenue prior to the time and date for Receipt of Bids in order for his Bid to be considered. Each Bidder's registration certificate number shall be written in the space provided on the Form of Proposal. All bidders are required to be licensed to perform work in the State prior to submitting a bid for this project as required by Chapter 21, Article 11, of the Code of West Virginia. Each Bidder's Contractor license number shall be written in the space provided on the Form of Proposal. The Owner reserves the right to reject any or all bids, the right to waive minor informalities and procedures in bidding, and the right to withhold final award of contract for 60 days after opening bids. The bidder to whom the contract is awarded shall execute and deliver to the Owner within 10 days after the award, and before signing the contract, a Performance Bond and Payment Bond utilizing the bond forms bound in the Project Manual each in a penal sum equal to at least the contract sum and the cost of such bonds shall be included in the bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents