Similar Projects
Last Updated | 09/29/2022 09:38 AM |
Project Title | Cary Apex Water Treatment Maintenance Facility |
Physical Address | View project details and contacts |
City, State (County) | Apex, NC 27523 (Wake County) |
Category(s) | Commercial, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Warehouse/Storage |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,484,400 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New construction includes a pre-engineered metal building system, associated footings, concrete slab on grade, alternate steel structural system for a mezzanine, exterior CMY and metal panel wall assembly, standing seam metal roof system, doors, frames, hardware, insulated translucent fiberglass sandwich panels, overhead doors, and solar PV panels mounted to the roof. The work also includes metal storage shelving and wire storage lockers. Contractors offering a proposal on this project must be licensed to do the specified type of contracting in the State of North Carolina. All bids must include a Non-Collusive Affidavit. Contractors offering a proposal on this project must comply, and must ensure that they and their subcontractors comply, with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes, "Verification of Work Authorization," and must provide documentation or sign affidavits or any other documents requested by the Town of Cary demonstrating such compliance. Each proposal shall be accompanied by a bid deposit in the amount of not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instruction to Bidders The Town of Cary reserves the right to reject any or all proposals On being awarded the Contract, the Bidder shall execute a Performance Bond and a Payment Bond, on the forms included herein, each equal to one hundred percent (100%) of the Contract Price (Contract Sum), as security for the faithful performance of the Contract. |
||||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 5,209 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |