Similar Projects
C--Multiple Award Task Order Contract (MATOC) for Geotechnical Engineering Service
Design
$5,000 to $20,000 est. value

C--Multiple Award Task Order Contract (MATOC) for Various Design, Construction Ins
Design
$3,500 to $100,000,000 est. value

MPA 575 CR 96 Educational Facility Master Planner - School Construction Projects, Master Price Agreement - Continuous Recruitment
Term Contract
Bidding
Providence, RI 02908

MPA 575 CR 96 Educational Facility Master Planner - School Construction Projects, Master Price Agreement - Continuous Recruitment
Term Contract
Bidding
Providence, RI 02908

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Bidding

Teen Zone Design
Post-Bid
Pawtucket, RI 02860

R--Indefinite-Delivery/Indefinite Quantity (ID/IQ), Multiple Award Contract (MAC) for Archaeological and Architectural Services
Results
Less than $30,000,000 est. value

C1JZ--National Region AE IDIQ
Bidding
$20,000,000 est. value

Indefinite Delivery/Indefinite Quantity (IDIQ) procurement to acquire Architect-Engineer (AE) Services under individual task orders throughout the Mobile District Area of Responsibility (AOR) to support Mobile District Planning and Environmental Division
Post-Bid

Corrosion Engineering Services
Results
$100,000 to $13,500,000 est. value

Indefinite Delivery Indefinite Quantity Architectural Engineering Contracts
New Construction
Bidding
Denver, CO - Atlanta, GA - Boston, MA - Philadelphia, PA 80225

Reported 04/28/2021 12:00 AM
Project Title

C222--650-22-103 AE Replace Primary Substation

Physical Address View project details and contacts
City, State (County) Providence, RI 02908   (Providence County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The A/E shall prepare design and construction documents, and provide construction period services to: • Replace the existing outdoor utility substation with a new outdoor substation of adequate capacity to meet the future needs of the PVAMC. The new substation should be constructed adjacent to the existing substation, keeping the existing substation operational until the new substation has been fully commissioned and is supporting the campus loads. • Coordinate the design with the local utility provider National Grid. The design must be compatible with the utility’s anticipated upgrades to the incoming service to the PVAMC campus from Chalkstone Ave. Provide all documentation, drawings, etc. as needed to accommodate the utility company’s easement requirements. • Include a phasing plan to maintain power to the campus during installation and commissioning of the new substation. The phasing plan should include a method to connect the existing substation load bus to the incoming main breaker of the new substation in order to provide temporary power for commissioning, and for phasing in the existing loads. • Perform the necessary site investigations to confirm the configuration of the existing utility and branch feeders. Develop a new site plan showing at a minimum all new equipment (including new utility equipment), underground duct banks, manholes, perimeter security, and landscaping. The design must accommodate the requirements shown in the attached utility one-line diagram and incorporate the utility manhole specifications, also attached. All requirements as stated in the attached National Grid Specification for Electrical Installations must be met. •The new substation must be able to accommodate the existing load configuration plus have two fully functional extra circuit breakers for future needs. Substation functionality should match or exceed existing, including metering, overload protection, and battery system complete with charger. Coordinate with the utility regarding the need for the auto transfer between primary and alternate feeders as this equipment may be supplied by the utility and installed on site. •Coordinate with the local utility to determine what utility equipment will be installed in conjunction with this project, and what, if any, will be installed in the future. For any future equipment, this project shall include the required site preparation such as equipment pads, manholes, conduits, etc. •Include all required documentation to construct approximately 500 feet of underground duct bank for future use. The duct bank should originate at the new substation and terminate in a manhole and include adequate conduits (plus spares) for two future feeders. Coordinate the route and manhole placement with the VA project manager. •Include all required documentation for the decommissioning, removal, and disposal of the existing substation. This project involves civil, electrical, fire/life safety and architectural disciplines.

Details

Architectural, Build-Out.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents