Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

SR 8009 Ramp C over I-79
Infrastructure
Design
$75,000 CJ est. value
Erie, PA 16501

Fuel Storage and Dispensing Project
New Construction, Infrastructure
Bidding
$114,600 CJ est. value
Edinboro, PA 16412

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Asbestos Abatement, Structure Demolition, and Site Restoration
Demolition, Infrastructure, Alteration
Post-Bid
Fairview, PA 16415

Bartlett Road Bridge No. 1 Replacement Project
Results
Harborcreek, PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

SR 19: I-90 to Rotunda Dr
Infrastructure
Conception
$2,830,000 CJ est. value
Summit Township, PA 16441

Erie's Bayfront Parkway Multimodal
Infrastructure
Design
$14,793,360 CJ est. value
Erie, PA 16502

Pavement and Concrete Replacement - District Wide
Infrastructure
Post-Bid
Erie, PA

Erie Group E21
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Last Updated 04/07/2023 04:04 AM
Project Title

Erie 2022 Bridge Shotcrete Group

Physical Address View project details and contacts
City, State (County) Erie, PA 16504   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2032
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various structures on various state routes in Erie County Primary Improvement Type: Bridge Preservation Activities As of April 07, 2023, the project is in development stage. Anticipated letting date is March 16, 2035. NTP Date: 2035-05-15. PennDOT - Erie 2022 Bridge Shotcrete Group *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents