Similar Projects
Chippewa Mall Drive Extension
Infrastructure
Bidding
$340,000 est. value
Chippewa Falls, WI 54729

190th Street, CTH X to 70th Avenue Town Road Improvement Discretionary Program (TRID)
Infrastructure
Bidding
$310,000 est. value
WI

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Bridgewater Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Blacktop
Infrastructure
Post-Bid
Holcombe, WI

Irvine Street and Summit Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Roadwork
Infrastructure
Post-Bid
Bloomer, WI

Reported 07/09/2022 12:00 AM
Project Title

85th Avenue / 105th Street Pulverizing Bids

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $35,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids to Pulverize 105th Street & 85th Avenue Town of Tilden, Chippewa County is requesting itemized bids for pulverizing sections of two (2) township roads: Pulverize 105th Street starting approximately 1/2 mile north of 85th Avenue as directed, proceeding south to 85th Avenue then east on 85th Avenue to Chippewa County Highway S as directed. Work to be completed by Sept. 30, 2022. Bid to include recycling all existing pavement, adding three (3) inches of 1 1 /4-inch diameter gravel prior to full depth pulverizing at a 22-foot width.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents