Similar Projects
Tifft Nature Preserve Accessibility Trail
New Construction
Conception
Buffalo, NY 14203

Federal Street Townhouses
New Construction, Renovation
Conception
Rochester, NY 14605

Kingstonian Uptown Revitalization
New Construction - 9,000 SF
Design
$20,900,000 est. value
Kingston, NY 12401

Kingstonian Uptown Revitalization
New Construction - 9,000 SF
Design
$20,900,000 est. value
Kingston, NY 12401

Main Street Apartments
New Construction - 160,000 SF
Sub-Bidding
$51,000,000 est. value
Peekskill, NY 10566

Alexan Westchester
New Construction
Sub-Bidding
Harrison, NY 10604

MVHS Integrated Health Campus
New Construction - 670,000 SF
Post-Bid
$500,000,000 est. value
Utica, NY 13502

Refurbishment of Garden Avenue Tennis Courts 4 and 5
Post-Bid
Bronxville, NY 10708

Sally Port/Garage Rehabilitation
Results
White Plains, NY 10600

Louis M. Pascone Memorial Park Tennis Court Reconstruction Project
Results
Ardsley, NY 10502

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

Saint Regis Residences Rye
New Construction, Demolition - 245,000 SF
Construction
$100,000,000 est. value
Rye, NY 10580

Cedar Street Mixed Use Building
New Construction - 2,000 SF
Pending Verification
Dobbs Ferry, NY 10522

Halfmoon Heights Community Center
New Construction - 2,200 SF
Pending Verification
Clifton Park, NY 12065

Main Street Apartments
New Construction, Demolition
Conception
Tarrytown, NY 10591

Last Updated 02/16/2021 01:34 PM
Project Title

Samuel S. Stratton Department of Veterans Affairs Medical Center Parking Garage, Albany, NY

Physical Address View project details and contacts
City, State (County) Albany, NY   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The facility has a significant need for additional parking to accommodate their patients and employees. This project will construct a 2-3 story parking garage with the capability of future expansion to a total of 5 floors. The project will also have an elevator that will also be expandable to 5-stories and a connecting corridor from the parking garage to the 3rd floor of the main hospital. Site lighting, fire protection, CCTV and additional features will be required.

Details

1 Parking Garage, 5 Stories Above Grade, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents