Similar Projects
Middlesex IM 089-2 (50)
Bidding
$1,000,000 to $2,500,000 est. value
Middlesex, VT

Williston STP SCRP (17)
Bidding
$1,000,000 to $2,500,000 est. value
Williston, VT

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

Shady Rill Recreation Area Streambank Restoration - Phase 3 Implementation
Post-Bid
Middlesex, VT

River Bank Retaining Wall Replacement
Results
$1,600,000 est. value
Springfield, VT

ANR-FWL Dummerston Fishing Access Improvements
Results
$110,000 est. value
Dummerston, VT

Cady Road Culvert No. 1 Replacement Project
Bidding
$118,000 est. value
Middlebury, VT

2020 Grants in Aid Project
Post-Bid
Norwich, VT 05055

Cranberry Hill Culvert
Results
Winhall, VT

Box Culvert Replacement Design/Build
Bidding
$130,000 est. value
Sharon, VT

SFY2021 Deer Brook Gully Stabilization and Stormwater Mitigation Project
Post-Bid
Less than $400,000 est. value
Georgia, VT

Design, Engineer and Install a Box Culvert on Lottery Lane
Results
Weathersfield, VT

Construction for Ditching and Culvert Replacement on Turnpike Road and Alger Brook Road
Bidding
Strafford, VT

Middlebury River Flood Resiliency Project
Post-Bid
Middlebury, VT

Little Kidder Brook Culvert
Results
Stratton, VT 05360

Last Updated 06/22/2020 12:58 PM
Project Title

Porter Road Culvert

Physical Address View project details and contacts
City, State (County) Cabot, VT 05647   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: On TH 58, Porter Road, approximately 400' southerly of the intersection with US Route 2. Construction of a temporary, oneway detour and temporary bridge, installation and/or construction of erosion prevention and sediment control measures, installation and/or construction of a temporary stream diversion; removal and disposal of the existing structure; assembly and installation of a new aluminum box culvert, headwalls and wingwalls; related roadway approach work including earthworks and subbase material, the placement of precast concrete traffic barrier sections, guard rail, related channel work, wetlands restoration work, and turf establishment together with the removal and cleanup of the temporary detour and temporary bridge and regrading and seeding of all affected areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents