Similar Projects
Gracepoint School
Renovation - 30,000 SF
Conception
Marietta, GA 30060

Devin's Shire Townhome Community
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Kennesaw, GA 30144

South Cobb Drive Convenience Store
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
Kennesaw, GA 30144

Lower Roswell Road Safety and Operational Improvements
Infrastructure
Bidding
$9,000,000 CJ est. value
Marietta, GA 30068

Chattahoochee River Trail Pedestrian Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Marietta, GA 30060

Construction Time and Materials
New Construction
Post-Bid
Kennesaw, GA

Construction, Renovation, and Modifications of West Side Elementary
Renovation, Addition - 71,000 SF
Post-Bid
$11,500,000 est. value
Marietta, GA 30064

Site Improvements at Durham Park and Taylor-Brawner Park
Infrastructure
Results
Smyrna, GA 30080

Sope Creek Elementary School P.E. Building Replacement
New Construction, Addition - 12,000 SF
Results
$2,838,000 est. value
Marietta, GA 30067

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

Kennesaw Crossing Storage
New Construction, Infrastructure - 138,000 SF
Pending Verification
$15,000,000 CJ est. value
Kennesaw, GA 30144

Cooper Lake Road Townhomes Development
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mableton, GA 30126

Silver Comet Connector (Project No. X2415 - 2016 SPLOST - Dist 2)
Infrastructure
Design
$5,100,000 CJ est. value
Marietta, GA 30060

Vehicle/Equipment Storage Building at Adult Detention Center
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Marietta, GA 30008

Last Updated 09/21/2022 09:47 AM
Project Title

New EastValley Elementary School - Cobb County School District

Physical Address View project details and contacts
City, State (County) Marietta, GA 30067   (Cobb County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $31,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The school is scheduled to welcome students to the brand-new building at the start of the 2023-24 school year on the grounds of the old East Cobb Middle School. The new Eastvalley facility will be a modernized building equipped to meet the school community's needs for many years to come. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

136,110 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents