Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Post IAF Airline Realignment GC/CM - Bid Package IB - Concrete
Renovation
Sub-Bidding
$125,000 CJ est. value
Seattle, WA 98164

Lindbergh High School Modernization and Additions - BP-3.1 Concrete
Alteration
Post-Bid
$1,475,000 est. value
Renton, WA 98058

2022 Mary M Knight Parking Lot
Infrastructure
Post-Bid
$830,000 CJ est. value
Elma, WA 98541

Morton Fueling Station Rebid
New Construction, Infrastructure
Results
$792,862 CJ est. value
Spokane, WA 99207

Kent Prairie Elementary Site Access
Renovation
Results
$944,600 CJ est. value
Arlington, WA 98223

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

Prosser Memorial Health Replacement Hospital - BP-02 Building Concrete
Demolition, New Construction, Infrastructure
Construction
$5,318,600 CJ est. value
Prosser, WA 99350

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Sequim MSL5 Lab 223 Replacement
Renovation
Post-Bid
$600,000 CJ est. value
Sequim, WA 98382

Edison, Whitman, Lincoln Safe Routes to Schools - REBID
Infrastructure
Results
$1,286,732 CJ est. value
Tacoma, WA 98405

Prosser Memorial Health Replacement Hospital Bid Package #12: General Works
Demolition, New Construction, Infrastructure
Construction
$50,000 CJ est. value
Prosser, WA 99350

Concrete Vault Purchase
Alteration
Post-Bid
Cheney, WA

I-205 / Glen Jackson Bridge to I-5 - Replace Deteriorated Concrete Panels
Alteration
Results
$2,500,000 to $3,000,000 est. value
Ridgefield, WA 98642

Last Updated 10/11/2023 10:09 AM
Project Title

Methow Street Improvements

Physical Address View project details and contacts
City, State (County) Wenatchee, WA 98801   (Chelan County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,428,038 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work include, pavement planing; hot mix asphalt paving for trench repair and overlay; replacing and constructing new cement concrete curb and gutter, sidewalk, and curb ramps; constructing new sanitary sewer pipe; replacing and constructing new stormwater collection and conveyance pipe and structures; replacing and installing new water main; pavement marking; signing; Work will also include sawcutting, crushed surfacing, and traffic control. All work shall be completed in accordance with the contract plans, special provisions, and the 2022 WSDOT/APWA Standard Specifications. The Engineers estimated range of probable cost is $1.2M to $1.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents