Similar Projects
Buried Fiberglass Fuel Tanks
Infrastructure
Bidding
Madison, WI

Above Ground Fuel Tank Storage System
Infrastructure
Post-Bid
Lodi, WI 53555

Fort Mccoy Central Fuels Repair
Term Contract
Post-Bid
Fort McCoy, WI

Capitol Drive Airport Fuel System Upgrade
Results
Pewaukee, WI 53072

2020 Chemical Phosphorus Improvements
Results
Waterloo, WI 53594

Fuel System Relocation and Upgrade
Alteration
Post-Bid
Appleton, WI

Fueling Facility Upgrades
Results
McFarland, WI 53558

Fuel System Upgrade
Alteration
Post-Bid
Oconomowoc, WI

Installation of Radon Gas Mitigation System
Results
Milwaukee, WI 53207

Fuel Tank Replacement and Infrastructure
Infrastructure
Post-Bid
Nashotah, Sussex, WI 53058

Fueling System Removal
Results
Less than $258,500 est. value
Wisconsin Rapids, WI

Hartford Municipal Airport
New Construction
Post-Bid
Madison, WI

Landfill Phase 4 Gas System
Results
$210,300 est. value
Janesville, WI

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Post-Bid
$3,500,000 est. value
Madison, WI 53706

DPW Yard Fuel Tank Replacement
Results
Greenfield, WI 53220

Last Updated 12/27/2021 11:20 PM
Project Title

Propane Backup Replacement

Physical Address View project details and contacts
City, State (County) Oneida, WI 54155   (Outagamie County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $127,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Replacement of propane vaporizer, tank, pump, accessories, piping, and associated electrical work. Work also includes some general construction work such as trenching for electrical conduit run, backfill, and seeding

Details

Division 02 - Existing Conditions, Common Work Results for Existing Conditions, Demolition.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Facility Fuel Piping.
Division 26 - Electrical, Common Work Results for Electrical, Commissioning of Electrical Systems, Electrical and Cathodic Protection.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents