Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

South Dewey Road Resurfacing
Infrastructure
Bidding
$104,700 est. value
Elyria, OH

Pavement Maintenance at Middle School, Early Learning Center, High School and Heritage Elementary
Infrastructure
Bidding
$300,000 est. value
Avon, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Baumhart Road Resurfacing
Results
$323,046 est. value
Elyria, OH

OPWC Local Roadway Rehabilitation Project - Round 34 - Contract A
Results
$1,118,939 est. value
Lorain, OH

2022 Amherst Road Program
Infrastructure
Bidding
$2,000,000 est. value
Amherst, OH

Four Lane Resurfacing - SR 10-00.00
Infrastructure
Post-Bid
OH

OPWC Local Roadway Rehabilitation Project - Round 34 - Contract B
Results
$845,475 est. value
Lorain, OH

2022 Crack Seal
Infrastructure
Bidding
$100,000 est. value
North Ridgeville, OH 44039

Resurfacing of LOR-CR17-6.98 (Lake Breeze Road) LOR-CR641-0.45 (Harris Road)
Infrastructure
Post-Bid
$605,602 est. value
Sheffield Lake, OH 44054

Cooper Foster Park Drive and Ashwood Boulevard Water Distribution Spot Repairs
Results
$125,000 est. value
Lorain, OH

North Ridge Road Resurfacing
Infrastructure
Bidding
$386,333 est. value
Elyria, OH 44036

Intersection - LOR-SR 83-02.48
Infrastructure
Post-Bid
$3,244,000 est. value
OH

Last Updated 04/21/2022 09:01 AM
Project Title

Issue I South Boone Road Reconstruction

Physical Address View project details and contacts
City, State (County) Columbia Station, OH 44028   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $187,555
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The section of South Boone Road TR-130 to be reconstructed begins on Boone Road from the south end of new pavement at State Route 82 to Emmons Road intersection, approximately 7,730 ft.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents