Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bridge Deck Preservation near Vernal
Infrastructure
Post-Bid
$500,000 CJ est. value
Vernal, UT 84078

UT Flap 2500(1) Taylor Mountain Road
Renovation
Results
$6,000,000 to $8,000,000 est. value
Vernal, UT

US-40; Naples N City Limits To 9000 E
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
UT

Uinta Basin Railway
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Vernal, UT 84078

Uinta Basin Railway
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Vernal, UT 84078

Jones Hole National Fish Hatchery - Water System Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Vernal, UT 84078

US-191; Moonshine Arch Trailhead Access Road
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Installation of Water and Wastewater Services for Ute Tribe Water Systems
Infrastructure
Post-Bid
$160,000 CJ est. value
Fort Duchesne, UT 84026

TIIMP - Pavement Repair
Infrastructure
Results
$1,980,000 est. value
Vernal, UT

Western Park Ice Rink and Amphitheater Project
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Vernal, UT 84078

Uintah School District UHS Agricultural Building
New Construction, Infrastructure
Results
$3,581,880 CJ est. value
Vernal, UT 84078

Construction of the 500 West Safe Sidewalk Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Vernal, UT 84078

Multi-step Bidding Process for General Contractors Red Fleet State Park - New Campground
New Construction, Infrastructure
Results
$7,025,814 CJ est. value
Vernal, UT 84078

Shepherd's Weir
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Fort Duchesne, UT 84026

Last Updated 06/06/2023 06:33 PM
Project Title

2850 South Access Improvement Project

Physical Address View project details and contacts
City, State (County) Naples, UT 84078   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,684,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals must be in a sealed envelope and labeled "2850 South Access Improvement Project". Late bids will not be accepted. Naples City is soliciting bids for the re-construction of Approximately 1200 sq ft of roadway located at the intersection of 2850 South 1500 East. This project will remove existing surface materials and re-construct this section of the roadway removing the water crossing that exists at the intersection to create a smoother transition to the highway. The Contractor will be responsible for the removal of the existing concrete water crossing, curb and gutter, asphalt, and base materials for the project. After the removal of those items the contractor will replace the base, asphalt, curb, and gutter. Approximately 735 square feet of asphalt and base will be replaced and approximately 60 linear feet of curb and gutter, with an alternate bid item to replace approximately 210 square feet of sidewalk. This work shall consist of furnishing all labor, material, and equipment necessary to perform all operations for the re-construction of the specified roadway.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents