Similar Projects
King George Inn Redevelopment
New Construction, Renovation - 18,500 SF
Conception
Allentown, PA 18103

Lehigh Valley Intermediate Airport Hotel & Retail
New Construction
Conception
Allentown, PA 18109

Sun Center Studios Hotel
New Construction - 108,000 SF
Design
Aston, PA 19014

Tru by Hilton Hotel
New Construction
Design
Hazle Township, PA 18202

Demolition of Structures and Clearing of Property
Demolition
Post-Bid
Erie, PA 16505

W Hotel / Element by Westin
New Construction - 715,200 SF
Construction
$240,000,000 est. value
Philadelphia, PA 19102

Homewood Suites
New Construction - 65,000 SF
Construction
$10,000,000 est. value
Carlisle, PA 17013

Damascus Hotel
Renovation
Pending Verification
Damascus, PA 18415

Hyatt Place Hotel
New Construction - 8,500 SF
Pending Verification
$25,000,000 est. value
Wilkes-Barre, PA 18701

Hilton Hotel at Columbia Mall
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bloomsburg, PA 17815

Tru by Hilton
New Construction - 44,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Grantville, PA 17028

Sora West
New Construction - 400,000 SF
Construction
$325,000,000 est. value
Conshohocken, PA 19428

Holiday Inn
New Construction
Pending Verification
Danville, Montoursville, PA 17821

The Willows at Ashcombe Mansion - Reception Hall, Cottages and Courtyard: Phase 2
New Construction - 19,970 SF
Conception
$1,800,000 est. value
Mechanicsburg, PA 17055

Lehigh Valley Resort and Spa - Master Plan
New Construction, Renovation, Addition - 124,000 SF
Design
Northampton, PA 18067

Last Updated 01/04/2021 10:11 AM
Project Title

Holiday Inn

Physical Address View project details and contacts
City, State (County) State College, PA 16803   (Centre County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Construction Commenced third quarter 2019, Construction Complete as of fourth quarter 2020
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 4 Stories Above Grade, 62,199 SF New Construction 101 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents