Similar Projects
Pump Repair and Maintenance Services
Bidding
Tucson, AZ

Construction Manager at Risk Services - Well 20 Improvement - Market Place
Bidding
Tempe, AZ

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Fuel Pump Dispenser Replacement
Post-Bid
Tucson, AZ

Y--Construct a Secondary Water Well at Temple Bar, La
Results
$250,000 to $500,000 est. value
AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Fuel Pump Maintenance & Repairs at Grand Canyon NP
Post-Bid
Grand Canyon, AZ

Clean Evaluate Well
Results
Glendale, AZ 85309

Watson Wash Well Abandonment
Post-Bid
Phoenix, AZ

Valentine Well
Results
Phoenix, AZ 85027

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Irrigation Pump Replacement
Results
Lake Havasu City, AZ 86406

Carrizo Production Wells
Post-Bid
$100,000 to $250,000 est. value
Fort Apache, AZ

Job Order Contracting - Well Maintenance and Repair
Term Contract
Results
Kingman, AZ 86401

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Last Updated 01/07/2020 11:25 AM
Project Title

Z--Yuma - 242 Well Expansion

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85364   (Yuma County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the 242 Wellfield Expansion and the Yuma Mesa Conduit Extension energy dissipation structures at Colorado River Basin Salinity Control Project: Cast-in-place concrete structures, metallic pipe, valves and equipment, power, testing, and earthwork: North Structure "A" (Transition Structure) - Structural Concrete - Miscellaneous Metalwork - Excavation for Structures - Compacted Backfill about Structures - Metal Pipe South Structure "B"(Energy Dissipation Structure, Plunger Valve, Pipe, and Electrical) - Structural Concrete - Miscellaneous Metalwork - Complete Electrical System - Excavation for Structures - Compacted Backfill about Structures - Metal Pipe - Plunger Valve Assembly

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents